0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500C-FWPF323rd busiest of 597

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, Canada register

C-FWPF: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 87 tracked flights in the 12 months to 31 Oct 2026, on about 7 days a month and an estimated 309 hours in the air.

Every dot is one tracked Global 6000/6500C-FWPFMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

C-FWPF against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 6 flights a month (46th percentile, 323rd highest of 597), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 5 days flown a month (49th percentile, 305th highest of 597), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureC-FWPFPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month5.846th323rd of 5976.23.8 to 10.3
Days flown a month4.849th305th of 5974.83.0 to 7.2

01

How C-FWPF compares.

Flown less often than 54% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

87

every tracked flight in the twelve months, about 7 a month

Busiest Global 6000/6500s

323rd

of 597 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈309

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

C-FWPF flew more than the middle half of the fleet in 1 of 12 months. Its busiest month was June 2026, with 13 flights.

Tracked flights

Its busiest month was June 2026, with 13 flights. It did not fly in October 2026. The record has 34 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by C-FWPF, November 2025 to October 2026: busiest June 2026 (13), quietest October 2026 (0); 87 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20258
December 20256
January 20264
February 20267
March 20267
April 20267
May 20269
June 202613
July 20267
August 202610
September 20269
October 20260
Source: Aircraft Ledger, flight data for C-FWPF, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 597 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is C-FWPF.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 46th percentile

    5.8middle Global 6000/6500 6.2

    C-FWPF: 6 flights a month over the last two years (Nov 2024 – Nov 2026), the 46th percentile, 323rd highest of 597; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    C-FWPF5.8
    Percentile46th
    Rank from the highest323rd of 597
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month49th percentile

    4.8 dmiddle Global 6000/6500 4.8 d

    C-FWPF: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 49th percentile, 305th highest of 597; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    C-FWPF4.8
    Percentile49th
    Rank from the highest305th of 597
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year54th percentile

    ≈209 hrmiddle Global 6000/6500 ≈194 hr

    C-FWPF: 209 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 54th percentile, 275th highest of 597; the middle Global 6000/6500 194.

    The data behind this chart
    FigureValue
    C-FWPF209
    Percentile54th
    Rank from the highest275th of 597
    Middle Global 6000/6500194
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 18 Nov 2024. The grades count only flights between two known airports, 133 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether C-FWPF sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.7 : 1

Also graded: short hops. Leg length is shown as context.

C-FWPF sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

Not graded: not enough data.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on C-FWPF.

All four chapters, graded against every aircraft of its type.

Built from all 360 tracked flights by C-FWPF since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

C-FWPF, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about C-FWPF.

Cite this data

Aircraft Ledger. “C-FWPF: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/c-fwpf

How many hours does C-FWPF fly a year?

About 309 estimated hours in the 12 months to 31 Oct 2026, across 87 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is C-FWPF flown?

C-FWPF made 87 tracked flights in the 12 months to 31 Oct 2026, about 7 a month, and flew on about 7 days in each month it flew.

Does C-FWPF fly internationally?

42 of its 87 tracked flights in the 12 months to 31 Oct 2026, 78%, crossed a border.

When did C-FWPF last fly?

It was last tracked in September 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports C-FWPF uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for C-FWPF?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.