02040600102030Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Challenger 300C-GVFX633rd busiest of 855

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Challenger 300, Canada register

C-GVFX: how this Bombardier Challenger 300 is flown

Flown about as much as most Challenger 300s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 120 tracked flights in the 12 months to 31 Oct 2026, on about 7 days a month and an estimated 271 hours in the air.

Every dot is one tracked Challenger 300C-GVFXMiddle Challenger 300

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Challenger 300.

C-GVFX against 855 tracked Challenger 300s over the last two years (Nov 2024 – Nov 2026): 7 flights a month (26th percentile, 633rd highest of 855), where the middle Challenger 300 is at 11 and the middle half runs 7 to 30; 5 days flown a month (24th percentile, 650th highest of 855), where the middle Challenger 300 is at 7 and the middle half runs 5 to 15.

The data behind this chart
MeasureC-GVFXPercentileRank from the highestMiddle Challenger 300Middle half
Flights a month6.826th633rd of 85511.26.7 to 30.0
Days flown a month4.824th650th of 8557.34.9 to 15.2

01

How C-GVFX compares.

Flown less often than 74% of Challenger 300s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

120

every tracked flight in the twelve months, about 10 a month

Busiest Challenger 300s

633rd

of 855 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈271

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Challenger 300

02

Month by month.

C-GVFX stayed within or below the middle half of the fleet in every month. Its busiest month was August 2026, with 16 flights.

Tracked flights

Its busiest month was August 2026, with 16 flights, and its quietest October 2026, with 3. The record has 16 tracking gaps, so about one flight in 8 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by C-GVFX, November 2025 to October 2026: busiest August 2026 (16), quietest October 2026 (3); 120 in all, against about 11 a month for the middle Challenger 300.

The data behind this chart
MonthTracked flights
November 202513
December 20259
January 202612
February 20266
March 202610
April 20268
May 202614
June 202611
July 20267
August 202616
September 202611
October 20263
Source: Aircraft Ledger, flight data for C-GVFX, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 855 tracked Challenger 300s. Every dot is one aircraft; the gold one is C-GVFX.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 26th percentile

    6.8middle Challenger 300 11.2

    C-GVFX: 7 flights a month over the last two years (Nov 2024 – Nov 2026), the 26th percentile, 633rd highest of 855; the middle Challenger 300 11.

    The data behind this chart
    FigureValue
    C-GVFX6.8
    Percentile26th
    Rank from the highest633rd of 855
    Middle Challenger 30011.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month24th percentile

    4.8 dmiddle Challenger 300 7.3 d

    C-GVFX: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 24th percentile, 650th highest of 855; the middle Challenger 300 7.

    The data behind this chart
    FigureValue
    C-GVFX4.8
    Percentile24th
    Rank from the highest650th of 855
    Middle Challenger 3007.3
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year39th percentile

    ≈173 hrmiddle Challenger 300 ≈226 hr

    C-GVFX: 173 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 39th percentile, 522nd highest of 855; the middle Challenger 300 226.

    The data behind this chart
    FigureValue
    C-GVFX173
    Percentile39th
    Rank from the highest522nd of 855
    Middle Challenger 300226
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Challenger 300s; typical is the middle half. Percentiles compare this aircraft with every tracked Challenger 300, over its record since 18 Nov 2024. The grades count only flights between two known airports, 115 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Challenger 300 fleet page.

04

What only the report shows.

The fleet is shown, and whether C-GVFX sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Challenger 300: 1.7 : 1

Also graded: short hops. Leg length is shown as context.

C-GVFX sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Challenger 300: 5%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

C-GVFX sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle Challenger 300: 15%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

C-GVFX sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on C-GVFX.

All four chapters, graded against every aircraft of its type.

Built from all 178 tracked flights by C-GVFX since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

C-GVFX, Bombardier Challenger 300

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Challenger 300s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about C-GVFX.

Cite this data

Aircraft Ledger. “C-GVFX: how this Bombardier Challenger 300 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/c-gvfx

How many hours does C-GVFX fly a year?

About 271 estimated hours in the 12 months to 31 Oct 2026, across 120 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is C-GVFX flown?

C-GVFX made 120 tracked flights in the 12 months to 31 Oct 2026, about 10 a month, and flew on about 7 days in each month it flew.

Does C-GVFX fly internationally?

46 of its 120 tracked flights in the 12 months to 31 Oct 2026, 50%, crossed a border.

When did C-GVFX last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports C-GVFX uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for C-GVFX?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Challenger 300s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.