0102030+05101520Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 5000/5500EC-ODU45th busiest of 223

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 5000/5500, Spain register

EC-ODU: how this Bombardier Global 5000/5500 is flown

A busy Global 5000/5500: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 326 tracked flights in the 12 months to 31 Oct 2026, on about 14 days a month and an estimated 273 hours in the air.

Every dot is one tracked Global 5000/5500EC-ODUMiddle Global 5000/5500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 5000/5500.

EC-ODU against 223 tracked Global 5000/5500s over the last two years (Nov 2024 – Nov 2026): 15 flights a month (80th percentile, 45th highest of 223), where the middle Global 5000/5500 is at 7 and the middle half runs 4 to 11; 10 days flown a month (80th percentile, 45th highest of 223), where the middle Global 5000/5500 is at 5 and the middle half runs 3 to 8.

The data behind this chart
MeasureEC-ODUPercentileRank from the highestMiddle Global 5000/5500Middle half
Flights a month15.080th45th of 2236.63.9 to 10.9
Days flown a month9.780th45th of 2234.83.1 to 7.5

01

How EC-ODU compares.

Busier than 80% of Global 5000/5500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

326

every tracked flight in the twelve months, about 27 a month

Busiest Global 5000/5500s

45th

of 223 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈273

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 5000/5500

02

Month by month.

EC-ODU flew more than the middle half of the fleet in every month. Its busiest month was June 2026, with 40 flights.

Tracked flights

Its busiest month was June 2026, with 40 flights, and its quietest November 2025, with 16. The record has 98 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by EC-ODU, November 2025 to October 2026: busiest June 2026 (40), quietest November 2025 (16); 326 in all, against about 7 a month for the middle Global 5000/5500.

The data behind this chart
MonthTracked flights
November 202516
December 202519
January 202618
February 202626
March 202628
April 202625
May 202624
June 202640
July 202636
August 202635
September 202628
October 202631
Source: Aircraft Ledger, flight data for EC-ODU, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 223 tracked Global 5000/5500s. Every dot is one aircraft; the gold one is EC-ODU.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. 80th percentile

    15.0middle Global 5000/5500 6.6

    EC-ODU: 15 flights a month over the last two years (Nov 2024 – Nov 2026), the 80th percentile, 45th highest of 223; the middle Global 5000/5500 7.

    The data behind this chart
    FigureValue
    EC-ODU15
    Percentile80th
    Rank from the highest45th of 223
    Middle Global 5000/55006.6
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month80th percentile

    9.7 dmiddle Global 5000/5500 4.8 d

    EC-ODU: 10 days flown a month over the last two years (Nov 2024 – Nov 2026), the 80th percentile, 45th highest of 223; the middle Global 5000/5500 5.

    The data behind this chart
    FigureValue
    EC-ODU9.7
    Percentile80th
    Rank from the highest45th of 223
    Middle Global 5000/55004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year41st percentile

    ≈157 hrmiddle Global 5000/5500 ≈186 hr

    EC-ODU: 157 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 41st percentile, 132nd highest of 223; the middle Global 5000/5500 186.

    The data behind this chart
    FigureValue
    EC-ODU157
    Percentile41st
    Rank from the highest132nd of 223
    Middle Global 5000/5500186
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 5000/5500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 5000/5500, over its record since 18 Nov 2024. The grades count only flights between two known airports, 344 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 5000/5500 fleet page.

04

What only the report shows.

The fleet is shown, and whether EC-ODU sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 5000/5500: 2.2 : 1

Also graded: short hops. Leg length is shown as context.

EC-ODU sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 5000/5500: 7%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

EC-ODU sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on EC-ODU.

All four chapters, graded against every aircraft of its type.

Built from all 655 tracked flights by EC-ODU since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

EC-ODU, Bombardier Global 5000/5500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 5000/5500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about EC-ODU.

Cite this data

Aircraft Ledger. “EC-ODU: how this Bombardier Global 5000/5500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/ec-odu

How many hours does EC-ODU fly a year?

About 273 estimated hours in the 12 months to 31 Oct 2026, across 326 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is EC-ODU flown?

EC-ODU made 326 tracked flights in the 12 months to 31 Oct 2026, about 27 a month, and flew on about 14 days in each month it flew.

Does EC-ODU fly internationally?

60 of its 326 tracked flights in the 12 months to 31 Oct 2026, 33%, crossed a border.

When did EC-ODU last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports EC-ODU uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for EC-ODU?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 5000/5500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.