010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280N1540112th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, United States register

N1540: how this Gulfstream G280 is flown

Flown about as much as most G280s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 4 tracked flights in the 12 months to 31 Oct 2026, on about 2 days a month and an estimated 4 hours in the air.

Every dot is one tracked G280N1540Middle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

N1540 against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 11 flights a month (62nd percentile, 112th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 8 days flown a month (69th percentile, 91st highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureN1540PercentileRank from the highestMiddle G280Middle half
Flights a month11.262nd112th of 2929.15.9 to 13.8
Days flown a month8.069th91st of 2926.24.3 to 8.5

01

How N1540 compares.

Busier than 62% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

4

every tracked flight in the twelve months, about 0 a month

Busiest G280s

112th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈4

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

N1540 stayed within or below the middle half of the fleet in every month. Its busiest month was November 2025, with 4 flights.

Tracked flights

Its busiest month was November 2025, with 4 flights. It did not fly in December 2025. The record has 1 tracking gap, so about one flight in 4 may be missing and every count is a minimum.

November so far, to 14 November

Tracked flights by N1540, November 2025 to October 2026: busiest November 2025 (4), quietest December 2025 (0); 4 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 20254
December 20250
January 20260
February 20260
March 20260
April 20260
May 20260
June 20260
July 20260
August 20260
September 20260
October 20260
Source: Aircraft Ledger, flight data for N1540, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is N1540.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 62nd percentile

    11.2middle G280 9.1

    N1540: 11 flights a month over the last two years (Nov 2024 – Nov 2026), the 62nd percentile, 112th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    N154011.2
    Percentile62nd
    Rank from the highest112th of 292
    Middle G2809.1
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month69th percentile

    8.0 dmiddle G280 6.2 d

    N1540: 8 days flown a month over the last two years (Nov 2024 – Nov 2026), the 69th percentile, 91st highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    N15408
    Percentile69th
    Rank from the highest91st of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year67th percentile

    ≈226 hrmiddle G280 ≈183 hr

    N1540: 226 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 67th percentile, 97th highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    N1540226
    Percentile67th
    Rank from the highest97th of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 20 Nov 2024. The grades count only flights between two known airports, 123 since 20 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether N1540 sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

N1540 sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N1540 sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N1540 sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N1540.

All four chapters, graded against every aircraft of its type.

Built from all 526 tracked flights by N1540 since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N1540, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to N1540’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about N1540.

Cite this data

Aircraft Ledger. “N1540: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n1540

How many hours does N1540 fly a year?

About 4 estimated hours in the 12 months to 31 Oct 2026, across 4 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N1540 flown?

N1540 made 4 tracked flights in the 12 months to 31 Oct 2026, about 0 a month, and flew on about 2 days in each month it flew.

Does N1540 fly internationally?

None of its 4 tracked flights in the 12 months to 31 Oct 2026 crossed a border.

When did N1540 last fly?

It was last tracked in November 2025. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N1540 uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N1540?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.