05101520+051015Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle GVN204A441st busiest of 689

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream GV (G550), United States register

N204A: how this Gulfstream G550 is flown, against the Gulfstream GV fleet

Flown about as much as most GVs over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 54 tracked flights in the 12 months to 31 Oct 2026, on about 4 days a month and an estimated 178 hours in the air.

Every dot is one tracked GVN204AMiddle GV

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked GV.

N204A against 686 tracked GVs over the last two years (Nov 2024 – Nov 2026): 5 flights a month (36th percentile, 441st highest of 689), where the middle GV is at 6 and the middle half runs 4 to 9; 4 days flown a month (42nd percentile, 400th highest of 689), where the middle GV is at 5 and the middle half runs 3 to 6.

The data behind this chart
MeasureN204APercentileRank from the highestMiddle GVMiddle half
Flights a month4.636th441st of 6896.03.7 to 9.0
Days flown a month4.142nd400th of 6894.53.1 to 6.3

01

How N204A compares.

Flown less often than 64% of GVs, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

54

every tracked flight in the twelve months, about 5 a month

Busiest GVs

441st

of 689 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈178

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked GV

02

Month by month.

N204A flew more than the middle half of the fleet in 1 of 12 months. Its busiest month was April 2026, with 10 flights.

Tracked flights

Its busiest month was April 2026, with 10 flights, and its quietest February 2026, with 1. The record has 2 tracking gaps, so about one flight in 27 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by N204A, November 2025 to October 2026: busiest April 2026 (10), quietest February 2026 (1); 54 in all, against about 6 a month for the middle GV.

The data behind this chart
MonthTracked flights
November 20252
December 20252
January 20265
February 20261
March 20263
April 202610
May 20265
June 20266
July 20266
August 20266
September 20262
October 20266
Source: Aircraft Ledger, flight data for N204A, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 689 tracked GVs. Every dot is one aircraft; the gold one is N204A.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 36th percentile

    4.6middle GV 6.0

    N204A: 5 flights a month over the last two years (Nov 2024 – Nov 2026), the 36th percentile, 441st highest of 689; the middle GV 6.

    The data behind this chart
    FigureValue
    N204A4.6
    Percentile36th
    Rank from the highest441st of 689
    Middle GV6
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month42nd percentile

    4.1 dmiddle GV 4.5 d

    N204A: 4 days flown a month over the last two years (Nov 2024 – Nov 2026), the 42nd percentile, 400th highest of 689; the middle GV 5.

    The data behind this chart
    FigureValue
    N204A4.1
    Percentile42nd
    Rank from the highest400th of 689
    Middle GV4.5
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year60th percentile

    ≈201 hrmiddle GV ≈177 hr

    N204A: 201 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 60th percentile, 276th highest of 689; the middle GV 177.

    The data behind this chart
    FigureValue
    N204A201
    Percentile60th
    Rank from the highest276th of 689
    Middle GV177
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of GVs; typical is the middle half. Percentiles compare this aircraft with every tracked GV, over its record since 18 Nov 2024. The grades count only flights between two known airports, 102 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream GV fleet page.

04

What only the report shows.

The fleet is shown, and whether N204A sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle GV: 2.5 : 1

Also graded: short hops. Leg length is shown as context.

N204A sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle GV: 4%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N204A sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle GV: 30%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N204A sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N204A.

All four chapters, graded against every aircraft of its type.

Built from all 205 tracked flights by N204A since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N204A, Gulfstream GV

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other GVs? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

GVs flown closest to N204A’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every GV we track, tail by tail →

07

Questions about N204A.

Cite this data

Aircraft Ledger. “N204A: how this Gulfstream GV is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n204a

How many hours does N204A fly a year?

About 178 estimated hours in the 12 months to 31 Oct 2026, across 54 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N204A flown?

N204A made 54 tracked flights in the 12 months to 31 Oct 2026, about 5 a month, and flew on about 4 days in each month it flew.

Does N204A fly internationally?

6 of its 54 tracked flights in the 12 months to 31 Oct 2026, 11%, crossed a border.

When did N204A last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N204A uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N204A?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked GVs, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.