010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280N209FB120th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, United States register

N209FB: how this Gulfstream G280 is flown

Flown about as much as most G280s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 10 tracked flights in the 12 months to 31 Oct 2026, on about 1 days a month and an estimated 15 hours in the air.

Every dot is one tracked G280N209FBMiddle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

N209FB against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 10 flights a month (59th percentile, 120th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 6 days flown a month (52nd percentile, 141st highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureN209FBPercentileRank from the highestMiddle G280Middle half
Flights a month10.459th120th of 2929.15.9 to 13.8
Days flown a month6.352nd141st of 2926.24.3 to 8.5

01

How N209FB compares.

Busier than 59% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

10

every tracked flight in the twelve months, about 1 a month

Busiest G280s

120th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈15

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

N209FB stayed within or below the middle half of the fleet in every month. Its busiest month was August 2026, with 6 flights.

Tracked flights

Its busiest month was August 2026, with 6 flights. It did not fly in November 2025. The record has 3 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 14 November

Tracked flights by N209FB, November 2025 to October 2026: busiest August 2026 (6), quietest November 2025 (0); 10 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 20250
December 20251
January 20260
February 20261
March 20260
April 20260
May 20260
June 20260
July 20261
August 20266
September 20261
October 20260
Source: Aircraft Ledger, flight data for N209FB, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is N209FB.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 59th percentile

    10.4middle G280 9.1

    N209FB: 10 flights a month over the last two years (Nov 2024 – Nov 2026), the 59th percentile, 120th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    N209FB10.4
    Percentile59th
    Rank from the highest120th of 292
    Middle G2809.1
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month52nd percentile

    6.3 dmiddle G280 6.2 d

    N209FB: 6 days flown a month over the last two years (Nov 2024 – Nov 2026), the 52nd percentile, 141st highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    N209FB6.3
    Percentile52nd
    Rank from the highest141st of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year48th percentile

    ≈177 hrmiddle G280 ≈183 hr

    N209FB: 177 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 48th percentile, 152nd highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    N209FB177
    Percentile48th
    Rank from the highest152nd of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 20 Nov 2024. The grades count only flights between two known airports, 94 since 20 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether N209FB sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

N209FB sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N209FB sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N209FB sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N209FB.

All four chapters, graded against every aircraft of its type.

Built from all 486 tracked flights by N209FB since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N209FB, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to N209FB’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about N209FB.

Cite this data

Aircraft Ledger. “N209FB: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n209fb

How many hours does N209FB fly a year?

About 15 estimated hours in the 12 months to 31 Oct 2026, across 10 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N209FB flown?

N209FB made 10 tracked flights in the 12 months to 31 Oct 2026, about 1 a month, and flew on about 1 days in each month it flew.

Does N209FB fly internationally?

None of its 10 tracked flights in the 12 months to 31 Oct 2026 crossed a border.

When did N209FB last fly?

It was last tracked in September 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N209FB uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N209FB?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.