0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500N20HQ407th busiest of 598

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, United States register

N20HQ: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 88 tracked flights in the 12 months to 31 Oct 2026, on about 6 days a month and an estimated 164 hours in the air.

Every dot is one tracked Global 6000/6500N20HQMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

N20HQ against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 4 flights a month (32nd percentile, 407th highest of 598), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 4 days flown a month (34th percentile, 395th highest of 598), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN20HQPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month4.532nd407th of 5986.23.8 to 10.3
Days flown a month3.634th395th of 5984.83.0 to 7.2

01

How N20HQ compares.

Flown less often than 68% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

88

every tracked flight in the twelve months, about 7 a month

Busiest Global 6000/6500s

407th

of 598 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈164

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

N20HQ flew more than the middle half of the fleet in 1 of 12 months. Its busiest month was July 2026, with 15 flights.

Tracked flights

Its busiest month was July 2026, with 15 flights, and its quietest December 2025, with 4. The record has 32 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 14 November

Tracked flights by N20HQ, November 2025 to October 2026: busiest July 2026 (15), quietest December 2025 (4); 88 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20256
December 20254
January 20264
February 202610
March 20265
April 20264
May 202610
June 20268
July 202615
August 20267
September 20268
October 20267
Source: Aircraft Ledger, flight data for N20HQ, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 598 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is N20HQ.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 32nd percentile

    4.5middle Global 6000/6500 6.2

    N20HQ: 4 flights a month over the last two years (Nov 2024 – Nov 2026), the 32nd percentile, 407th highest of 598; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    N20HQ4.5
    Percentile32nd
    Rank from the highest407th of 598
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month34th percentile

    3.6 dmiddle Global 6000/6500 4.8 d

    N20HQ: 4 days flown a month over the last two years (Nov 2024 – Nov 2026), the 34th percentile, 395th highest of 598; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    N20HQ3.6
    Percentile34th
    Rank from the highest395th of 598
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year10th percentile

    ≈88 hrmiddle Global 6000/6500 ≈196 hr

    N20HQ: 88 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 10th percentile, 538th highest of 598; the middle Global 6000/6500 196.

    The data behind this chart
    FigureValue
    N20HQ88
    Percentile10th
    Rank from the highest538th of 598
    Middle Global 6000/6500196
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 19 Nov 2024. The grades count only flights between two known airports, 107 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether N20HQ sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.6 : 1

Also graded: short hops. Leg length is shown as context.

N20HQ sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N20HQ sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on N20HQ.

All four chapters, graded against every aircraft of its type.

Built from all 314 tracked flights by N20HQ since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N20HQ, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about N20HQ.

Cite this data

Aircraft Ledger. “N20HQ: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n20hq

How many hours does N20HQ fly a year?

About 164 estimated hours in the 12 months to 31 Oct 2026, across 88 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N20HQ flown?

N20HQ made 88 tracked flights in the 12 months to 31 Oct 2026, about 7 a month, and flew on about 6 days in each month it flew.

Does N20HQ fly internationally?

20 of its 88 tracked flights in the 12 months to 31 Oct 2026, 39%, crossed a border.

When did N20HQ last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N20HQ uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N20HQ?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.