0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500N29FR353rd busiest of 598

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, United States register

N29FR: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 8 tracked flights in the 12 months to 31 Oct 2026, on about 2 days a month and an estimated 16 hours in the air.

Every dot is one tracked Global 6000/6500N29FRMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

N29FR against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 5 flights a month (41st percentile, 353rd highest of 598), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 4 days flown a month (40th percentile, 359th highest of 598), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN29FRPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month5.441st353rd of 5986.33.8 to 10.3
Days flown a month4.140th359th of 5984.83.0 to 7.2

01

How N29FR compares.

Flown less often than 59% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

8

every tracked flight in the twelve months, about 1 a month

Busiest Global 6000/6500s

353rd

of 598 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈16

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

N29FR stayed within or below the middle half of the fleet in every month. Its busiest month was November 2025, with 3 flights.

Tracked flights

Its busiest month was November 2025, with 3 flights. It did not fly in March 2026. The record has 1 tracking gap, so about one flight in 8 may be missing and every count is a minimum.

November so far, to 14 November

Tracked flights by N29FR, November 2025 to October 2026: busiest November 2025 (3), quietest March 2026 (0); 8 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20253
December 20252
January 20262
February 20261
March 20260
April 20260
May 20260
June 20260
July 20260
August 20260
September 20260
October 20260
Source: Aircraft Ledger, flight data for N29FR, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 598 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is N29FR.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 41st percentile

    5.4middle Global 6000/6500 6.3

    N29FR: 5 flights a month over the last two years (Nov 2024 – Nov 2026), the 41st percentile, 353rd highest of 598; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    N29FR5.4
    Percentile41st
    Rank from the highest353rd of 598
    Middle Global 6000/65006.3
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month40th percentile

    4.1 dmiddle Global 6000/6500 4.8 d

    N29FR: 4 days flown a month over the last two years (Nov 2024 – Nov 2026), the 40th percentile, 359th highest of 598; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    N29FR4.1
    Percentile40th
    Rank from the highest359th of 598
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year57th percentile

    ≈221 hrmiddle Global 6000/6500 ≈197 hr

    N29FR: 221 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 57th percentile, 258th highest of 598; the middle Global 6000/6500 197.

    The data behind this chart
    FigureValue
    N29FR221
    Percentile57th
    Rank from the highest258th of 598
    Middle Global 6000/6500197
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 20 Nov 2024. The grades count only flights between two known airports, 86 since 20 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether N29FR sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.7 : 1

Also graded: short hops. Leg length is shown as context.

N29FR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N29FR sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on N29FR.

All four chapters, graded against every aircraft of its type.

Built from all 357 tracked flights by N29FR since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N29FR, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about N29FR.

Cite this data

Aircraft Ledger. “N29FR: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n29fr

How many hours does N29FR fly a year?

About 16 estimated hours in the 12 months to 31 Oct 2026, across 8 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N29FR flown?

N29FR made 8 tracked flights in the 12 months to 31 Oct 2026, about 1 a month, and flew on about 2 days in each month it flew.

Does N29FR fly internationally?

5 of its 8 tracked flights in the 12 months to 31 Oct 2026, 83%, crossed a border.

When did N29FR last fly?

It was last tracked in February 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N29FR uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N29FR?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.