010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280N307HR16th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, United States register

N307HR: how this Gulfstream G280 is flown

A busy G280: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 300 tracked flights in the 12 months to 31 Oct 2026, on about 14 days a month and an estimated 510 hours in the air.

Every dot is one tracked G280N307HRMiddle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

N307HR against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 24 flights a month (95th percentile, 16th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 13 days flown a month (96th percentile, 13th highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureN307HRPercentileRank from the highestMiddle G280Middle half
Flights a month24.195th16th of 2929.05.9 to 13.7
Days flown a month13.396th13th of 2926.24.3 to 8.5

01

How N307HR compares.

Busier than 95% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

300

every tracked flight in the twelve months, about 25 a month

Busiest G280s

16th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈510

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

N307HR flew more than the middle half of the fleet in 10 of 12 months. Its busiest month was June 2026, with 42 flights.

Tracked flights

Its busiest month was June 2026, with 42 flights, and its quietest September 2026, with 1. The record has 26 tracking gaps, so about one flight in 12 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by N307HR, November 2025 to October 2026: busiest June 2026 (42), quietest September 2026 (1); 300 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 202525
December 202530
January 202622
February 202626
March 202638
April 202638
May 202626
June 202642
July 202621
August 20267
September 20261
October 202624
Source: Aircraft Ledger, flight data for N307HR, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is N307HR.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. 95th percentile

    24.1middle G280 9.0

    N307HR: 24 flights a month over the last two years (Nov 2024 – Nov 2026), the 95th percentile, 16th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    N307HR24.1
    Percentile95th
    Rank from the highest16th of 292
    Middle G2809
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month96th percentile

    13.3 dmiddle G280 6.2 d

    N307HR: 13 days flown a month over the last two years (Nov 2024 – Nov 2026), the 96th percentile, 13th highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    N307HR13.3
    Percentile96th
    Rank from the highest13th of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year97th percentile

    ≈508 hrmiddle G280 ≈183 hr

    N307HR: 508 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 97th percentile, 10th highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    N307HR508
    Percentile97th
    Rank from the highest10th of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 18 Nov 2024. The grades count only flights between two known airports, 578 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether N307HR sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

N307HR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N307HR sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N307HR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N307HR.

All four chapters, graded against every aircraft of its type.

Built from all 1,078 tracked flights by N307HR since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N307HR, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to N307HR’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about N307HR.

Cite this data

Aircraft Ledger. “N307HR: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n307hr

How many hours does N307HR fly a year?

About 510 estimated hours in the 12 months to 31 Oct 2026, across 300 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N307HR flown?

N307HR made 300 tracked flights in the 12 months to 31 Oct 2026, about 25 a month, and flew on about 14 days in each month it flew.

Does N307HR fly internationally?

9 of its 300 tracked flights in the 12 months to 31 Oct 2026, 3%, crossed a border.

When did N307HR last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N307HR uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N307HR?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.