0102030051015Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G650N342ZK49th busiest of 535

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G650, United States register

N342ZK: how this Gulfstream G650 is flown

A busy G650: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 147 tracked flights in the 12 months to 31 Oct 2026, on about 11 days a month and an estimated 207 hours in the air.

Every dot is one tracked G650N342ZKMiddle G650

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G650.

N342ZK against 536 tracked G650s over the last two years (Nov 2024 – Nov 2026): 13 flights a month (91st percentile, 49th highest of 535), where the middle G650 is at 6 and the middle half runs 4 to 9; 8 days flown a month (86th percentile, 76th highest of 535), where the middle G650 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN342ZKPercentileRank from the highestMiddle G650Middle half
Flights a month12.891st49th of 5356.33.8 to 9.4
Days flown a month7.986th76th of 5354.83.2 to 7.0

01

How N342ZK compares.

Busier than 91% of G650s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

147

every tracked flight in the twelve months, about 12 a month

Busiest G650s

49th

of 535 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈207

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G650

02

Month by month.

N342ZK flew more than the middle half of the fleet in 8 of 12 months. Its busiest month was May 2026, with 25 flights.

Tracked flights

Its busiest month was May 2026, with 25 flights. It did not fly in November 2025. The record has 19 tracking gaps, so about one flight in 8 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by N342ZK, November 2025 to October 2026: busiest May 2026 (25), quietest November 2025 (0); 147 in all, against about 6 a month for the middle G650.

The data behind this chart
MonthTracked flights
November 20250
December 20250
January 20260
February 20260
March 202612
April 202621
May 202625
June 202616
July 202618
August 202621
September 202613
October 202621
Source: Aircraft Ledger, flight data for N342ZK, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 535 tracked G650s. Every dot is one aircraft; the gold one is N342ZK.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. 91st percentile

    12.8middle G650 6.3

    N342ZK: 13 flights a month over the last two years (Nov 2024 – Nov 2026), the 91st percentile, 49th highest of 535; the middle G650 6.

    The data behind this chart
    FigureValue
    N342ZK12.8
    Percentile91st
    Rank from the highest49th of 535
    Middle G6506.3
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month86th percentile

    7.9 dmiddle G650 4.8 d

    N342ZK: 8 days flown a month over the last two years (Nov 2024 – Nov 2026), the 86th percentile, 76th highest of 535; the middle G650 5.

    The data behind this chart
    FigureValue
    N342ZK7.9
    Percentile86th
    Rank from the highest76th of 535
    Middle G6504.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year60th percentile

    ≈232 hrmiddle G650 ≈206 hr

    N342ZK: 232 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 60th percentile, 215th highest of 535; the middle G650 206.

    The data behind this chart
    FigureValue
    N342ZK232
    Percentile60th
    Rank from the highest215th of 535
    Middle G650206
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G650s; typical is the middle half. Percentiles compare this aircraft with every tracked G650, over its record since 18 Nov 2024. The grades count only flights between two known airports, 218 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G650 fleet page.

04

What only the report shows.

The fleet is shown, and whether N342ZK sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G650: 2.7 : 1

Also graded: short hops. Leg length is shown as context.

N342ZK sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G650: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N342ZK sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G650: 26%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N342ZK sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N342ZK.

All four chapters, graded against every aircraft of its type.

Built from all 460 tracked flights by N342ZK since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N342ZK, Gulfstream G650

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G650s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G650s flown closest to N342ZK’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G650 we track, tail by tail →

07

Questions about N342ZK.

Cite this data

Aircraft Ledger. “N342ZK: how this Gulfstream G650 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n342zk

How many hours does N342ZK fly a year?

About 207 estimated hours in the 12 months to 31 Oct 2026, across 147 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N342ZK flown?

N342ZK made 147 tracked flights in the 12 months to 31 Oct 2026, about 12 a month, and flew on about 11 days in each month it flew.

Does N342ZK fly internationally?

50 of its 147 tracked flights in the 12 months to 31 Oct 2026, 42%, crossed a border.

When did N342ZK last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N342ZK uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N342ZK?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G650s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.