Chapter 4
Utilization
Typical for its type
How hard has it been used?
Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.
Flights a monthLead measure. 47th percentile
Middle 8.3N400TU050+7.9middle BeechJet 400 8.3
N400TU: 8 flights a month over the last two years (Nov 2024 – Nov 2026), the 47th percentile, 168th highest of 316; the middle BeechJet 400 8.
The data behind this chart
Figure Value N400TU 7.9 Percentile 47th Rank from the highest 168th of 316 Middle BeechJet 400 8.3 Window the last two years (Nov 2024 – Nov 2026) Days flown a month51st percentile
Middle 5.4N400TU020+5.5 dmiddle BeechJet 400 5.4 d
N400TU: 6 days flown a month over the last two years (Nov 2024 – Nov 2026), the 51st percentile, 155th highest of 316; the middle BeechJet 400 5.
The data behind this chart
Figure Value N400TU 5.5 Percentile 51st Rank from the highest 155th of 316 Middle BeechJet 400 5.4 Window the last two years (Nov 2024 – Nov 2026) Estimated hours a year58th percentile
Middle 140N400TU0700+≈177 hrmiddle BeechJet 400 ≈140 hr
N400TU: 177 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 58th percentile, 133rd highest of 316; the middle BeechJet 400 140.
The data behind this chart
Figure Value N400TU 177 Percentile 58th Rank from the highest 133rd of 316 Middle BeechJet 400 140 Window the last two years (Nov 2024 – Nov 2026)