0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500N421AL216th busiest of 597

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, United States register

N421AL: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 115 tracked flights in the 12 months to 31 Oct 2026, on about 6 days a month and an estimated 354 hours in the air.

Every dot is one tracked Global 6000/6500N421ALMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

N421AL against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 8 flights a month (64th percentile, 216th highest of 597), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 5 days flown a month (52nd percentile, 287th highest of 597), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN421ALPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month7.964th216th of 5976.23.8 to 10.3
Days flown a month5.052nd287th of 5974.83.0 to 7.2

01

How N421AL compares.

Busier than 64% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

115

every tracked flight in the twelve months, about 10 a month

Busiest Global 6000/6500s

216th

of 597 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈354

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

N421AL flew more than the middle half of the fleet in 5 of 12 months. Its busiest month was March 2026, with 20 flights.

Tracked flights

Its busiest month was March 2026, with 20 flights. It did not fly in May 2026. The record has 19 tracking gaps, so about one flight in 6 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by N421AL, November 2025 to October 2026: busiest March 2026 (20), quietest May 2026 (0); 115 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 202512
December 202516
January 20269
February 202610
March 202620
April 20263
May 20260
June 202613
July 20267
August 20267
September 202614
October 20264
Source: Aircraft Ledger, flight data for N421AL, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 597 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is N421AL.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 64th percentile

    7.9middle Global 6000/6500 6.2

    N421AL: 8 flights a month over the last two years (Nov 2024 – Nov 2026), the 64th percentile, 216th highest of 597; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    N421AL7.9
    Percentile64th
    Rank from the highest216th of 597
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month52nd percentile

    5.0 dmiddle Global 6000/6500 4.8 d

    N421AL: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 52nd percentile, 287th highest of 597; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    N421AL5
    Percentile52nd
    Rank from the highest287th of 597
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year60th percentile

    ≈226 hrmiddle Global 6000/6500 ≈194 hr

    N421AL: 226 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 60th percentile, 239th highest of 597; the middle Global 6000/6500 194.

    The data behind this chart
    FigureValue
    N421AL226
    Percentile60th
    Rank from the highest239th of 597
    Middle Global 6000/6500194
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 18 Nov 2024. The grades count only flights between two known airports, 182 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether N421AL sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.7 : 1

Also graded: short hops. Leg length is shown as context.

N421AL sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N421AL sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on N421AL.

All four chapters, graded against every aircraft of its type.

Built from all 496 tracked flights by N421AL since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N421AL, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about N421AL.

Cite this data

Aircraft Ledger. “N421AL: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n421al

How many hours does N421AL fly a year?

About 354 estimated hours in the 12 months to 31 Oct 2026, across 115 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N421AL flown?

N421AL made 115 tracked flights in the 12 months to 31 Oct 2026, about 10 a month, and flew on about 6 days in each month it flew.

Does N421AL fly internationally?

25 of its 115 tracked flights in the 12 months to 31 Oct 2026, 27%, crossed a border.

When did N421AL last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N421AL uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N421AL?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.