Chapter 4
Utilization
Typical for its type
How hard has it been used?
Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.
Flights a monthLead measure. 57th percentile
Middle 8.3N475TC050+10.6middle BeechJet 400 8.3
N475TC: 11 flights a month over the last two years (Nov 2024 – Nov 2026), the 57th percentile, 136th highest of 316; the middle BeechJet 400 8.
The data behind this chart
Figure Value N475TC 10.6 Percentile 57th Rank from the highest 136th of 316 Middle BeechJet 400 8.3 Window the last two years (Nov 2024 – Nov 2026) Days flown a month51st percentile
Middle 5.4N475TC020+5.5 dmiddle BeechJet 400 5.4 d
N475TC: 6 days flown a month over the last two years (Nov 2024 – Nov 2026), the 51st percentile, 155th highest of 316; the middle BeechJet 400 5.
The data behind this chart
Figure Value N475TC 5.5 Percentile 51st Rank from the highest 155th of 316 Middle BeechJet 400 5.4 Window the last two years (Nov 2024 – Nov 2026) Estimated hours a year42nd percentile
Middle 140N475TC0700+≈107 hrmiddle BeechJet 400 ≈140 hr
N475TC: 107 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 42nd percentile, 184th highest of 316; the middle BeechJet 400 140.
The data behind this chart
Figure Value N475TC 107 Percentile 42nd Rank from the highest 184th of 316 Middle BeechJet 400 140 Window the last two years (Nov 2024 – Nov 2026)