010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280N506RP10th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, United States register

N506RP: how this Gulfstream G280 is flown

A busy G280: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 417 tracked flights in the 12 months to 31 Oct 2026, on about 16 days a month and an estimated 733 hours in the air.

Every dot is one tracked G280N506RPMiddle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

N506RP against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 28 flights a month (97th percentile, 10th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 14 days flown a month (98th percentile, 7th highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureN506RPPercentileRank from the highestMiddle G280Middle half
Flights a month27.697th10th of 2929.15.9 to 13.8
Days flown a month14.098th7th of 2926.24.3 to 8.5

01

How N506RP compares.

Busier than 97% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

417

every tracked flight in the twelve months, about 35 a month

Busiest G280s

10th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈733

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

N506RP flew more than the middle half of the fleet in every month. Its busiest month was March 2026, with 51 flights.

Tracked flights

Its busiest month was March 2026, with 51 flights, and its quietest November 2025, with 20. The record has 43 tracking gaps, so about one flight in 10 may be missing and every count is a minimum.

November so far, to 14 November

Tracked flights by N506RP, November 2025 to October 2026: busiest March 2026 (51), quietest November 2025 (20); 417 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 202520
December 202521
January 202638
February 202627
March 202651
April 202638
May 202632
June 202637
July 202646
August 202641
September 202628
October 202638
Source: Aircraft Ledger, flight data for N506RP, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is N506RP.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. 97th percentile

    27.6middle G280 9.1

    N506RP: 28 flights a month over the last two years (Nov 2024 – Nov 2026), the 97th percentile, 10th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    N506RP27.6
    Percentile97th
    Rank from the highest10th of 292
    Middle G2809.1
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month98th percentile

    14.0 dmiddle G280 6.2 d

    N506RP: 14 days flown a month over the last two years (Nov 2024 – Nov 2026), the 98th percentile, 7th highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    N506RP14
    Percentile98th
    Rank from the highest7th of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year>99th percentile

    ≈581 hrmiddle G280 ≈183 hr

    N506RP: 581 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the >99th percentile, 2nd highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    N506RP581
    Percentile>99th
    Rank from the highest2nd of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 20 Nov 2024. The grades count only flights between two known airports, 690 since 20 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether N506RP sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

N506RP sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N506RP sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N506RP sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N506RP.

All four chapters, graded against every aircraft of its type.

Built from all 1,120 tracked flights by N506RP since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N506RP, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to N506RP’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about N506RP.

Cite this data

Aircraft Ledger. “N506RP: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n506rp

How many hours does N506RP fly a year?

About 733 estimated hours in the 12 months to 31 Oct 2026, across 417 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N506RP flown?

N506RP made 417 tracked flights in the 12 months to 31 Oct 2026, about 35 a month, and flew on about 16 days in each month it flew.

Does N506RP fly internationally?

15 of its 417 tracked flights in the 12 months to 31 Oct 2026, 4%, crossed a border.

When did N506RP last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N506RP uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N506RP?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.