0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500N562TH382nd busiest of 597

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, United States register

N562TH: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 83 tracked flights in the 12 months to 31 Oct 2026, on about 7 days a month and an estimated 203 hours in the air.

Every dot is one tracked Global 6000/6500N562THMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

N562TH against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 5 flights a month (36th percentile, 382nd highest of 597), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 4 days flown a month (39th percentile, 365th highest of 597), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN562THPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month4.936th382nd of 5976.23.8 to 10.3
Days flown a month4.039th365th of 5974.83.0 to 7.2

01

How N562TH compares.

Flown less often than 64% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

83

every tracked flight in the twelve months, about 7 a month

Busiest Global 6000/6500s

382nd

of 597 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈203

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

N562TH flew more than the middle half of the fleet in 2 of 12 months. Its busiest month was November 2025, with 13 flights.

Tracked flights

Its busiest month was November 2025, with 13 flights. It did not fly in May 2026. The record has 26 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by N562TH, November 2025 to October 2026: busiest November 2025 (13), quietest May 2026 (0); 83 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 202513
December 20258
January 20266
February 20263
March 20269
April 20268
May 20260
June 20267
July 20267
August 202612
September 20268
October 20262
Source: Aircraft Ledger, flight data for N562TH, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 597 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is N562TH.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 36th percentile

    4.9middle Global 6000/6500 6.2

    N562TH: 5 flights a month over the last two years (Nov 2024 – Nov 2026), the 36th percentile, 382nd highest of 597; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    N562TH4.9
    Percentile36th
    Rank from the highest382nd of 597
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month39th percentile

    4.0 dmiddle Global 6000/6500 4.8 d

    N562TH: 4 days flown a month over the last two years (Nov 2024 – Nov 2026), the 39th percentile, 365th highest of 597; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    N562TH4
    Percentile39th
    Rank from the highest365th of 597
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year29th percentile

    ≈139 hrmiddle Global 6000/6500 ≈194 hr

    N562TH: 139 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 29th percentile, 424th highest of 597; the middle Global 6000/6500 194.

    The data behind this chart
    FigureValue
    N562TH139
    Percentile29th
    Rank from the highest424th of 597
    Middle Global 6000/6500194
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 18 Nov 2024. The grades count only flights between two known airports, 118 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether N562TH sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.7 : 1

Also graded: short hops. Leg length is shown as context.

N562TH sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N562TH sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on N562TH.

All four chapters, graded against every aircraft of its type.

Built from all 259 tracked flights by N562TH since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N562TH, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about N562TH.

Cite this data

Aircraft Ledger. “N562TH: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n562th

How many hours does N562TH fly a year?

About 203 estimated hours in the 12 months to 31 Oct 2026, across 83 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N562TH flown?

N562TH made 83 tracked flights in the 12 months to 31 Oct 2026, about 7 a month, and flew on about 7 days in each month it flew.

Does N562TH fly internationally?

23 of its 83 tracked flights in the 12 months to 31 Oct 2026, 45%, crossed a border.

When did N562TH last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N562TH uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N562TH?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.