0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500N626JJ138th busiest of 598

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, United States register

N626JJ: how this Bombardier Global 6000/6500 is flown

A busy Global 6000/6500: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 180 tracked flights in the 12 months to 31 Oct 2026, on about 12 days a month and an estimated 436 hours in the air.

Every dot is one tracked Global 6000/6500N626JJMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

N626JJ against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 11 flights a month (77th percentile, 138th highest of 598), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 9 days flown a month (84th percentile, 97th highest of 598), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN626JJPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month10.877th138th of 5986.23.8 to 10.3
Days flown a month8.784th97th of 5984.83.0 to 7.2

01

How N626JJ compares.

Busier than 77% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

180

every tracked flight in the twelve months, about 15 a month

Busiest Global 6000/6500s

138th

of 598 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈436

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

N626JJ flew more than the middle half of the fleet in 9 of 12 months. Its busiest month was June 2026, with 23 flights.

Tracked flights

Its busiest month was June 2026, with 23 flights, and its quietest April 2026, with 3. The record has 12 tracking gaps, so about one flight in 15 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by N626JJ, November 2025 to October 2026: busiest June 2026 (23), quietest April 2026 (3); 180 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20259
December 202519
January 20268
February 202613
March 202617
April 20263
May 202620
June 202623
July 202619
August 202619
September 202615
October 202615
Source: Aircraft Ledger, flight data for N626JJ, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 598 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is N626JJ.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. 77th percentile

    10.8middle Global 6000/6500 6.2

    N626JJ: 11 flights a month over the last two years (Nov 2024 – Nov 2026), the 77th percentile, 138th highest of 598; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    N626JJ10.8
    Percentile77th
    Rank from the highest138th of 598
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month84th percentile

    8.7 dmiddle Global 6000/6500 4.8 d

    N626JJ: 9 days flown a month over the last two years (Nov 2024 – Nov 2026), the 84th percentile, 97th highest of 598; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    N626JJ8.7
    Percentile84th
    Rank from the highest97th of 598
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year76th percentile

    ≈307 hrmiddle Global 6000/6500 ≈196 hr

    N626JJ: 307 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 76th percentile, 144th highest of 598; the middle Global 6000/6500 196.

    The data behind this chart
    FigureValue
    N626JJ307
    Percentile76th
    Rank from the highest144th of 598
    Middle Global 6000/6500196
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 19 Nov 2024. The grades count only flights between two known airports, 248 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether N626JJ sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.6 : 1

Also graded: short hops. Leg length is shown as context.

N626JJ sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N626JJ sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on N626JJ.

All four chapters, graded against every aircraft of its type.

Built from all 431 tracked flights by N626JJ since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N626JJ, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about N626JJ.

Cite this data

Aircraft Ledger. “N626JJ: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n626jj

How many hours does N626JJ fly a year?

About 436 estimated hours in the 12 months to 31 Oct 2026, across 180 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N626JJ flown?

N626JJ made 180 tracked flights in the 12 months to 31 Oct 2026, about 15 a month, and flew on about 12 days in each month it flew.

Does N626JJ fly internationally?

24 of its 180 tracked flights in the 12 months to 31 Oct 2026, 14%, crossed a border.

When did N626JJ last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N626JJ uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N626JJ?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.