010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280N755PA196th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, United States register

N755PA: how this Gulfstream G280 is flown

Flown about as much as most G280s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 128 tracked flights in the 12 months to 31 Oct 2026, on about 9 days a month and an estimated 304 hours in the air.

Every dot is one tracked G280N755PAMiddle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

N755PA against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 7 flights a month (33rd percentile, 196th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 6 days flown a month (44th percentile, 164th highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureN755PAPercentileRank from the highestMiddle G280Middle half
Flights a month6.833rd196th of 2929.15.9 to 13.7
Days flown a month5.644th164th of 2926.24.3 to 8.5

01

How N755PA compares.

Flown less often than 67% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

128

every tracked flight in the twelve months, about 11 a month

Busiest G280s

196th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈304

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

N755PA flew more than the middle half of the fleet in 4 of 12 months. Its busiest month was July 2026, with 20 flights.

Tracked flights

Its busiest month was July 2026, with 20 flights, and its quietest September 2026, with 1. The record has 17 tracking gaps, so about one flight in 8 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by N755PA, November 2025 to October 2026: busiest July 2026 (20), quietest September 2026 (1); 128 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 20259
December 202513
January 202612
February 20269
March 202617
April 202615
May 202615
June 20268
July 202620
August 20268
September 20261
October 20261
Source: Aircraft Ledger, flight data for N755PA, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is N755PA.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 33rd percentile

    6.8middle G280 9.1

    N755PA: 7 flights a month over the last two years (Nov 2024 – Nov 2026), the 33rd percentile, 196th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    N755PA6.8
    Percentile33rd
    Rank from the highest196th of 292
    Middle G2809.1
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month44th percentile

    5.6 dmiddle G280 6.2 d

    N755PA: 6 days flown a month over the last two years (Nov 2024 – Nov 2026), the 44th percentile, 164th highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    N755PA5.6
    Percentile44th
    Rank from the highest164th of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year51st percentile

    ≈185 hrmiddle G280 ≈183 hr

    N755PA: 185 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 51st percentile, 144th highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    N755PA185
    Percentile51st
    Rank from the highest144th of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 19 Nov 2024. The grades count only flights between two known airports, 170 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether N755PA sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

N755PA sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N755PA sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

N755PA sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on N755PA.

All four chapters, graded against every aircraft of its type.

Built from all 381 tracked flights by N755PA since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N755PA, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to N755PA’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about N755PA.

Cite this data

Aircraft Ledger. “N755PA: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n755pa

How many hours does N755PA fly a year?

About 304 estimated hours in the 12 months to 31 Oct 2026, across 128 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N755PA flown?

N755PA made 128 tracked flights in the 12 months to 31 Oct 2026, about 11 a month, and flew on about 9 days in each month it flew.

Does N755PA fly internationally?

7 of its 128 tracked flights in the 12 months to 31 Oct 2026, 7%, crossed a border.

When did N755PA last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N755PA uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N755PA?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.