010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280SP-NVM190th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, Poland register

SP-NVM: how this Gulfstream G280 is flown

Flown about as much as most G280s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 156 tracked flights in the 12 months to 31 Oct 2026, on about 8 days a month and an estimated 218 hours in the air.

Every dot is one tracked G280SP-NVMMiddle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

SP-NVM against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 7 flights a month (35th percentile, 190th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 5 days flown a month (37th percentile, 184th highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureSP-NVMPercentileRank from the highestMiddle G280Middle half
Flights a month7.035th190th of 2929.05.9 to 13.7
Days flown a month5.137th184th of 2926.24.3 to 8.5

01

How SP-NVM compares.

Flown less often than 65% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

156

every tracked flight in the twelve months, about 13 a month

Busiest G280s

190th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈218

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

SP-NVM flew more than the middle half of the fleet in 6 of 12 months. Its busiest month was July 2026, with 25 flights.

Tracked flights

Its busiest month was July 2026, with 25 flights, and its quietest December 2025, with 1. The record has 44 tracking gaps, so about one flight in 4 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by SP-NVM, November 2025 to October 2026: busiest July 2026 (25), quietest December 2025 (1); 156 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 202511
December 20251
January 202616
February 20264
March 202613
April 202615
May 202614
June 202615
July 202625
August 202619
September 202613
October 202610
Source: Aircraft Ledger, flight data for SP-NVM, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is SP-NVM.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 35th percentile

    7.0middle G280 9.0

    SP-NVM: 7 flights a month over the last two years (Nov 2024 – Nov 2026), the 35th percentile, 190th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    SP-NVM7
    Percentile35th
    Rank from the highest190th of 292
    Middle G2809
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month37th percentile

    5.1 dmiddle G280 6.2 d

    SP-NVM: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 37th percentile, 184th highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    SP-NVM5.1
    Percentile37th
    Rank from the highest184th of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year26th percentile

    ≈122 hrmiddle G280 ≈183 hr

    SP-NVM: 122 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 26th percentile, 216th highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    SP-NVM122
    Percentile26th
    Rank from the highest216th of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 18 Nov 2024. The grades count only flights between two known airports, 154 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether SP-NVM sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

SP-NVM sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

Not graded: not enough data.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

SP-NVM sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on SP-NVM.

All four chapters, graded against every aircraft of its type.

Built from all 386 tracked flights by SP-NVM since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

SP-NVM, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to SP-NVM’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about SP-NVM.

Cite this data

Aircraft Ledger. “SP-NVM: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/sp-nvm

How many hours does SP-NVM fly a year?

About 218 estimated hours in the 12 months to 31 Oct 2026, across 156 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is SP-NVM flown?

SP-NVM made 156 tracked flights in the 12 months to 31 Oct 2026, about 13 a month, and flew on about 8 days in each month it flew.

Does SP-NVM fly internationally?

81 of its 156 tracked flights in the 12 months to 31 Oct 2026, 78%, crossed a border.

When did SP-NVM last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports SP-NVM uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for SP-NVM?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.