0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 7500T7-JIM71st busiest of 219

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 7500, San Marino register

T7-JIM: how this Bombardier Global 7500 is flown

Flown about as much as most Global 7500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 141 tracked flights in the 12 months to 31 Oct 2026, on about 13 days a month and an estimated 376 hours in the air.

Every dot is one tracked Global 7500T7-JIMMiddle Global 7500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 7500.

T7-JIM against 219 tracked Global 7500s over the last two years (Nov 2024 – Nov 2026): 10 flights a month (68th percentile, 71st highest of 219), where the middle Global 7500 is at 7 and the middle half runs 5 to 12; 8 days flown a month (72nd percentile, 62nd highest of 219), where the middle Global 7500 is at 6 and the middle half runs 4 to 9.

The data behind this chart
MeasureT7-JIMPercentileRank from the highestMiddle Global 7500Middle half
Flights a month10.268th71st of 2197.44.5 to 12.0
Days flown a month8.472nd62nd of 2195.53.6 to 8.7

01

How T7-JIM compares.

Busier than 68% of Global 7500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

141

every tracked flight in the twelve months, about 12 a month

Busiest Global 7500s

71st

of 219 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈376

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 7500

02

Month by month.

T7-JIM flew more than the middle half of the fleet in 6 of 12 months. Its busiest month was December 2025, with 27 flights.

Tracked flights

Its busiest month was December 2025, with 27 flights. It did not fly in June 2026. The record has 49 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by T7-JIM, November 2025 to October 2026: busiest December 2025 (27), quietest June 2026 (0); 141 in all, against about 7 a month for the middle Global 7500.

The data behind this chart
MonthTracked flights
November 202517
December 202527
January 202621
February 202626
March 202623
April 202615
May 202611
June 20260
July 20261
August 20260
September 20260
October 20260
Source: Aircraft Ledger, flight data for T7-JIM, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 219 tracked Global 7500s. Every dot is one aircraft; the gold one is T7-JIM.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 68th percentile

    10.2middle Global 7500 7.4

    T7-JIM: 10 flights a month over the last two years (Nov 2024 – Nov 2026), the 68th percentile, 71st highest of 219; the middle Global 7500 7.

    The data behind this chart
    FigureValue
    T7-JIM10.2
    Percentile68th
    Rank from the highest71st of 219
    Middle Global 75007.4
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month72nd percentile

    8.4 dmiddle Global 7500 5.5 d

    T7-JIM: 8 days flown a month over the last two years (Nov 2024 – Nov 2026), the 72nd percentile, 62nd highest of 219; the middle Global 7500 6.

    The data behind this chart
    FigureValue
    T7-JIM8.4
    Percentile72nd
    Rank from the highest62nd of 219
    Middle Global 75005.5
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year77th percentile

    ≈410 hrmiddle Global 7500 ≈250 hr

    T7-JIM: 410 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 77th percentile, 51st highest of 219; the middle Global 7500 250.

    The data behind this chart
    FigureValue
    T7-JIM410
    Percentile77th
    Rank from the highest51st of 219
    Middle Global 7500250
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 7500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 7500, over its record since 18 Nov 2024. The grades count only flights between two known airports, 163 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 7500 fleet page.

04

What only the report shows.

The fleet is shown, and whether T7-JIM sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 7500: 2.9 : 1

Also graded: short hops. Leg length is shown as context.

T7-JIM sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 7500: 8%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

T7-JIM sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle Global 7500: 21%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

T7-JIM sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on T7-JIM.

All four chapters, graded against every aircraft of its type.

Built from all 328 tracked flights by T7-JIM since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

T7-JIM, Bombardier Global 7500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 7500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about T7-JIM.

Cite this data

Aircraft Ledger. “T7-JIM: how this Bombardier Global 7500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/t7-jim

How many hours does T7-JIM fly a year?

About 376 estimated hours in the 12 months to 31 Oct 2026, across 141 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is T7-JIM flown?

T7-JIM made 141 tracked flights in the 12 months to 31 Oct 2026, about 12 a month, and flew on about 13 days in each month it flew.

Does T7-JIM fly internationally?

51 of its 141 tracked flights in the 12 months to 31 Oct 2026, 73%, crossed a border.

When did T7-JIM last fly?

It was last tracked in July 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports T7-JIM uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for T7-JIM?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 7500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.