0102030+05101520Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 5000/5500T7-LJS81st busiest of 223

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 5000/5500, San Marino register

T7-LJS: how this Bombardier Global 5000/5500 is flown

Flown about as much as most Global 5000/5500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 17 tracked flights in the 12 months to 31 Oct 2026, on about 6 days a month and an estimated 60 hours in the air.

Every dot is one tracked Global 5000/5500T7-LJSMiddle Global 5000/5500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 5000/5500.

T7-LJS against 223 tracked Global 5000/5500s over the last two years (Nov 2024 – Nov 2026): 8 flights a month (64th percentile, 81st highest of 223), where the middle Global 5000/5500 is at 7 and the middle half runs 4 to 11; 6 days flown a month (63rd percentile, 83rd highest of 223), where the middle Global 5000/5500 is at 5 and the middle half runs 3 to 8.

The data behind this chart
MeasureT7-LJSPercentileRank from the highestMiddle Global 5000/5500Middle half
Flights a month8.464th81st of 2236.64.0 to 10.9
Days flown a month6.063rd83rd of 2234.83.1 to 7.5

01

How T7-LJS compares.

Busier than 64% of Global 5000/5500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

17

every tracked flight in the twelve months, about 1 a month

Busiest Global 5000/5500s

81st

of 223 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈60

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 5000/5500

02

Month by month.

T7-LJS stayed within or below the middle half of the fleet in every month. Its busiest month was November 2025, with 10 flights.

Tracked flights

Its busiest month was November 2025, with 10 flights. It did not fly in January 2026. The record has 3 tracking gaps, so about one flight in 6 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by T7-LJS, November 2025 to October 2026: busiest November 2025 (10), quietest January 2026 (0); 17 in all, against about 7 a month for the middle Global 5000/5500.

The data behind this chart
MonthTracked flights
November 202510
December 20257
January 20260
February 20260
March 20260
April 20260
May 20260
June 20260
July 20260
August 20260
September 20260
October 20260
Source: Aircraft Ledger, flight data for T7-LJS, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 223 tracked Global 5000/5500s. Every dot is one aircraft; the gold one is T7-LJS.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 64th percentile

    8.4middle Global 5000/5500 6.6

    T7-LJS: 8 flights a month over the last two years (Nov 2024 – Nov 2026), the 64th percentile, 81st highest of 223; the middle Global 5000/5500 7.

    The data behind this chart
    FigureValue
    T7-LJS8.4
    Percentile64th
    Rank from the highest81st of 223
    Middle Global 5000/55006.6
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month63rd percentile

    6.0 dmiddle Global 5000/5500 4.8 d

    T7-LJS: 6 days flown a month over the last two years (Nov 2024 – Nov 2026), the 63rd percentile, 83rd highest of 223; the middle Global 5000/5500 5.

    The data behind this chart
    FigureValue
    T7-LJS6
    Percentile63rd
    Rank from the highest83rd of 223
    Middle Global 5000/55004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year74th percentile

    ≈266 hrmiddle Global 5000/5500 ≈185 hr

    T7-LJS: 266 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 74th percentile, 59th highest of 223; the middle Global 5000/5500 185.

    The data behind this chart
    FigureValue
    T7-LJS266
    Percentile74th
    Rank from the highest59th of 223
    Middle Global 5000/5500185
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 5000/5500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 5000/5500, over its record since 19 Nov 2024. The grades count only flights between two known airports, 42 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 5000/5500 fleet page.

04

What only the report shows.

The fleet is shown, and whether T7-LJS sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 5000/5500: 2.2 : 1

Also graded: short hops. Leg length is shown as context.

T7-LJS sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 5000/5500: 7%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

T7-LJS sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on T7-LJS.

All four chapters, graded against every aircraft of its type.

Built from all 60 tracked flights by T7-LJS since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

T7-LJS, Bombardier Global 5000/5500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 5000/5500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about T7-LJS.

Cite this data

Aircraft Ledger. “T7-LJS: how this Bombardier Global 5000/5500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/t7-ljs

How many hours does T7-LJS fly a year?

About 60 estimated hours in the 12 months to 31 Oct 2026, across 17 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is T7-LJS flown?

T7-LJS made 17 tracked flights in the 12 months to 31 Oct 2026, about 1 a month, and flew on about 6 days in each month it flew.

Does T7-LJS fly internationally?

10 of its 17 tracked flights in the 12 months to 31 Oct 2026, 83%, crossed a border.

When did T7-LJS last fly?

It was last tracked in December 2025. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports T7-LJS uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for T7-LJS?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 5000/5500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.