010203040051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G280T7-VIR211th busiest of 292

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G280, San Marino register

T7-VIR: how this Gulfstream G280 is flown

Flown about as much as most G280s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 121 tracked flights in the 12 months to 31 Oct 2026, on about 8 days a month and an estimated 197 hours in the air.

Every dot is one tracked G280T7-VIRMiddle G280

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G280.

T7-VIR against 292 tracked G280s over the last two years (Nov 2024 – Nov 2026): 6 flights a month (28th percentile, 211th highest of 292), where the middle G280 is at 9 and the middle half runs 6 to 14; 5 days flown a month (32nd percentile, 199th highest of 292), where the middle G280 is at 6 and the middle half runs 4 to 8.

The data behind this chart
MeasureT7-VIRPercentileRank from the highestMiddle G280Middle half
Flights a month6.328th211th of 2929.15.9 to 13.7
Days flown a month4.832nd199th of 2926.24.3 to 8.5

01

How T7-VIR compares.

Flown less often than 72% of G280s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

121

every tracked flight in the twelve months, about 10 a month

Busiest G280s

211th

of 292 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈197

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G280

02

Month by month.

T7-VIR flew more than the middle half of the fleet in 2 of 12 months. Its busiest month was October 2026, with 19 flights.

Tracked flights

Its busiest month was October 2026, with 19 flights. It did not fly in September 2026. The record has 36 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by T7-VIR, November 2025 to October 2026: busiest October 2026 (19), quietest September 2026 (0); 121 in all, against about 9 a month for the middle G280.

The data behind this chart
MonthTracked flights
November 202513
December 20259
January 202612
February 202613
March 202611
April 20268
May 20264
June 202612
July 202616
August 20264
September 20260
October 202619
Source: Aircraft Ledger, flight data for T7-VIR, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 292 tracked G280s. Every dot is one aircraft; the gold one is T7-VIR.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 28th percentile

    6.3middle G280 9.1

    T7-VIR: 6 flights a month over the last two years (Nov 2024 – Nov 2026), the 28th percentile, 211th highest of 292; the middle G280 9.

    The data behind this chart
    FigureValue
    T7-VIR6.3
    Percentile28th
    Rank from the highest211th of 292
    Middle G2809.1
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month32nd percentile

    4.8 dmiddle G280 6.2 d

    T7-VIR: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 32nd percentile, 199th highest of 292; the middle G280 6.

    The data behind this chart
    FigureValue
    T7-VIR4.8
    Percentile32nd
    Rank from the highest199th of 292
    Middle G2806.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year24th percentile

    ≈117 hrmiddle G280 ≈183 hr

    T7-VIR: 117 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 24th percentile, 222nd highest of 292; the middle G280 183.

    The data behind this chart
    FigureValue
    T7-VIR117
    Percentile24th
    Rank from the highest222nd of 292
    Middle G280183
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G280s; typical is the middle half. Percentiles compare this aircraft with every tracked G280, over its record since 19 Nov 2024. The grades count only flights between two known airports, 76 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G280 fleet page.

04

What only the report shows.

The fleet is shown, and whether T7-VIR sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G280: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

T7-VIR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G280: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

T7-VIR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G280: 7%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

T7-VIR sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on T7-VIR.

All four chapters, graded against every aircraft of its type.

Built from all 134 tracked flights by T7-VIR since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

T7-VIR, Gulfstream G280

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G280s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G280s flown closest to T7-VIR’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G280 we track, tail by tail →

07

Questions about T7-VIR.

Cite this data

Aircraft Ledger. “T7-VIR: how this Gulfstream G280 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/t7-vir

How many hours does T7-VIR fly a year?

About 197 estimated hours in the 12 months to 31 Oct 2026, across 121 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is T7-VIR flown?

T7-VIR made 121 tracked flights in the 12 months to 31 Oct 2026, about 10 a month, and flew on about 8 days in each month it flew.

Does T7-VIR fly internationally?

40 of its 121 tracked flights in the 12 months to 31 Oct 2026, 57%, crossed a border.

When did T7-VIR last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports T7-VIR uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for T7-VIR?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G280s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.