Chapter 4
Utilization
Typical for its type
How hard has it been used?
Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.
Flights a monthLead measure. 41st percentile
Middle 10.7VH-ULJ040+7.8middle Learjet 60 10.7
VH-ULJ: 8 flights a month over the last two years (Nov 2024 – Nov 2026), the 41st percentile, 154th highest of 260; the middle Learjet 60 11.
The data behind this chart
Figure Value VH-ULJ 7.8 Percentile 41st Rank from the highest 154th of 260 Middle Learjet 60 10.7 Window the last two years (Nov 2024 – Nov 2026) Days flown a month39th percentile
Middle 6.6VH-ULJ020+5.2 dmiddle Learjet 60 6.6 d
VH-ULJ: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 39th percentile, 159th highest of 260; the middle Learjet 60 7.
The data behind this chart
Figure Value VH-ULJ 5.2 Percentile 39th Rank from the highest 159th of 260 Middle Learjet 60 6.6 Window the last two years (Nov 2024 – Nov 2026) Estimated hours a year68th percentile
Middle 191VH-ULJ0800+≈342 hrmiddle Learjet 60 ≈191 hr
VH-ULJ: 342 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 68th percentile, 84th highest of 260; the middle Learjet 60 191.
The data behind this chart
Figure Value VH-ULJ 342 Percentile 68th Rank from the highest 84th of 260 Middle Learjet 60 191 Window the last two years (Nov 2024 – Nov 2026)