05101520+051015Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G600VP-BTM132nd busiest of 173

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G600, United Kingdom register

VP-BTM: how this Gulfstream G600 is flown

A lightly flown G600: flown less than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 123 tracked flights in the 12 months to 31 Oct 2026, on about 9 days a month and an estimated 396 hours in the air.

Every dot is one tracked G600VP-BTMMiddle G600

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G600.

VP-BTM against 173 tracked G600s over the last two years (Nov 2024 – Nov 2026): 5 flights a month (24th percentile, 132nd highest of 173), where the middle G600 is at 7 and the middle half runs 5 to 10; 4 days flown a month (27th percentile, 127th highest of 173), where the middle G600 is at 5 and the middle half runs 4 to 7.

The data behind this chart
MeasureVP-BTMPercentileRank from the highestMiddle G600Middle half
Flights a month5.024th132nd of 1737.15.1 to 10.4
Days flown a month4.027th127th of 1735.33.9 to 7.3

01

How VP-BTM compares.

Flown less often than 76% of G600s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

123

every tracked flight in the twelve months, about 10 a month

Busiest G600s

132nd

of 173 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈396

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G600

02

Month by month.

VP-BTM flew more than the middle half of the fleet in 5 of 12 months. Its busiest month was April 2026, with 18 flights.

Tracked flights

Its busiest month was April 2026, with 18 flights, and its quietest February 2026, with 5. The record has 49 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by VP-BTM, November 2025 to October 2026: busiest April 2026 (18), quietest February 2026 (5); 123 in all, against about 7 a month for the middle G600.

The data behind this chart
MonthTracked flights
November 20258
December 202510
January 202610
February 20265
March 20269
April 202618
May 202610
June 202614
July 202611
August 202612
September 202611
October 20265
Source: Aircraft Ledger, flight data for VP-BTM, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 173 tracked G600s. Every dot is one aircraft; the gold one is VP-BTM.

Chapter 4

Utilization

Gentler than its type

How hard has it been used?

Light use spends maintenance intervals slowly, but long spells parked bring their own wear: seals, corrosion and preservation. Worth asking how it was stored.

  • Flights a monthLead measure. 24th percentile

    5.0middle G600 7.1

    VP-BTM: 5 flights a month over the last two years (Nov 2024 – Nov 2026), the 24th percentile, 132nd highest of 173; the middle G600 7.

    The data behind this chart
    FigureValue
    VP-BTM5
    Percentile24th
    Rank from the highest132nd of 173
    Middle G6007.1
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month27th percentile

    4.0 dmiddle G600 5.3 d

    VP-BTM: 4 days flown a month over the last two years (Nov 2024 – Nov 2026), the 27th percentile, 127th highest of 173; the middle G600 5.

    The data behind this chart
    FigureValue
    VP-BTM4
    Percentile27th
    Rank from the highest127th of 173
    Middle G6005.3
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year39th percentile

    ≈169 hrmiddle G600 ≈196 hr

    VP-BTM: 169 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 39th percentile, 106th highest of 173; the middle G600 196.

    The data behind this chart
    FigureValue
    VP-BTM169
    Percentile39th
    Rank from the highest106th of 173
    Middle G600196
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G600s; typical is the middle half. Percentiles compare this aircraft with every tracked G600, over its record since 18 Nov 2024. The grades count only flights between two known airports, 124 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G600 fleet page.

04

What only the report shows.

The fleet is shown, and whether VP-BTM sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G600: 2.3 : 1

Also graded: short hops. Leg length is shown as context.

VP-BTM sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G600: 4%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

VP-BTM sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G600: 29%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

VP-BTM sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on VP-BTM.

All four chapters, graded against every aircraft of its type.

Built from all 402 tracked flights by VP-BTM since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

VP-BTM, Gulfstream G600

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G600s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G600s flown closest to VP-BTM’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G600 we track, tail by tail →

07

Questions about VP-BTM.

Cite this data

Aircraft Ledger. “VP-BTM: how this Gulfstream G600 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vp-btm

How many hours does VP-BTM fly a year?

About 396 estimated hours in the 12 months to 31 Oct 2026, across 123 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VP-BTM flown?

VP-BTM made 123 tracked flights in the 12 months to 31 Oct 2026, about 10 a month, and flew on about 9 days in each month it flew.

Does VP-BTM fly internationally?

29 of its 123 tracked flights in the 12 months to 31 Oct 2026, 46%, crossed a border.

When did VP-BTM last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VP-BTM uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VP-BTM?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G600s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.