12345+1002003005001,0002,000+Hours per landingAverage leg, nmLong legs, fewer landingsMiddle Falcon 7XVP-CEX269th most landings for its hours of 272

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Dassault Falcon 7X, United Kingdom register

VP-CEX: how this Dassault Falcon 7X is flown

A Falcon 7X on long legs: fewer landings for its hours than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 42 tracked flights in the 12 months to 31 Oct 2026, on about 3 days a month and an estimated 149 hours in the air.

Every dot is one tracked Falcon 7XVP-CEXMiddle Falcon 7X

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Falcon 7X.

VP-CEX against 272 tracked Falcon 7Xs over the last two years (Nov 2024 – Nov 2026): 5 hours per landing (99th percentile, 4th highest of 272), where the middle Falcon 7X is at 2.3 and the middle half runs 1.8 to 2.9; 951 nm average leg (86th percentile, 39th highest of 272), where the middle Falcon 7X is at 608 nm and the middle half runs 423 nm to 810 nm.

The data behind this chart
MeasureVP-CEXPercentileRank from the highestMiddle Falcon 7XMiddle half
Hours per landing5.099th4th of 2722.31.8 to 2.9
Average leg951 nm86th39th of 272608 nm423 nm to 810 nm

01

How VP-CEX compares.

42 tracked flights in the twelve months to 31 Oct 2026.

Tracked flights

42

every tracked flight in the twelve months, about 4 a month

Days flown a month

3.4

in the months it flew

Estimated hours

≈149

every tracked flight in the twelve months, from time in the air

02

Month by month.

Its busiest month was December 2025, with 8 flights.

Tracked flights

Its busiest month was December 2025, with 8 flights, and its quietest February 2026, with 2. The record has 29 tracking gaps, so about one flight in 1 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by VP-CEX, November 2025 to October 2026: busiest December 2025 (8), quietest February 2026 (2); 42 in all.

The data behind this chart
MonthTracked flights
November 20255
December 20258
January 20263
February 20262
March 20263
April 20264
May 20262
June 20266
July 20263
August 20262
September 20262
October 20262
Source: Aircraft Ledger, flight data for VP-CEX, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 272 tracked Falcon 7Xs. Every dot is one aircraft; the gold one is VP-CEX.

Chapter 1

Fatigue

Gentler than its type

How short were its legs?

Utilization isn’t graded for VP-CEX: too few of its flights were tracked to count its use fairly, in the full report too. So its free chapter here is Fatigue, which doesn’t depend on catching every flight.

More hours for each landing, so fewer pressurization cycles for its time in the air.

  • Hours per landingLead measure. 99th percentile

    5.0 : 1middle Falcon 7X 2.3 : 1

    VP-CEX: 5 hours per landing over the last two years (Nov 2024 – Nov 2026), the 99th percentile, 4th highest of 272; the middle Falcon 7X 2.3.

    The data behind this chart
    FigureValue
    VP-CEX5
    Percentile99th
    Rank from the highest4th of 272
    Middle Falcon 7X2.3
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Short hops39th percentile

    26%middle Falcon 7X 29%

    VP-CEX: 26% short hops over the last two years (Nov 2024 – Nov 2026), the 39th percentile, 166th highest of 272; the middle Falcon 7X 29%.

    The data behind this chart
    FigureValue
    VP-CEX26%
    Percentile39th
    Rank from the highest166th of 272
    Middle Falcon 7X29%
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Leg length86th percentile

    951 nmmiddle Falcon 7X 608 nm

    VP-CEX: 951 nm leg length over the last two years (Nov 2024 – Nov 2026), the 86th percentile, 39th highest of 272; the middle Falcon 7X 608 nm.

    The data behind this chart
    FigureValue
    VP-CEX951 nm
    Percentile86th
    Rank from the highest39th of 272
    Middle Falcon 7X608 nm
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Falcon 7Xs; typical is the middle half. Percentiles compare this aircraft with every tracked Falcon 7X, over its record since 18 Nov 2024. The grades count only flights between two known airports, 23 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Dassault Falcon 7X fleet page.

04

What only the report shows.

The fleet is shown, and whether VP-CEX sits inside its middle half. Its grades and values are in the full report.

Chapter 2

Corrosion

Salt air, middle Falcon 7X: 4%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

Not graded: not enough data.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle Falcon 7X: 26%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

VP-CEX sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 4

Utilization

Flights a month, middle Falcon 7X: 6.1

Also graded: days flown a month and estimated hours a year.

Not graded: too few of its flights were tracked.

Unlock this chapter

05

The full report on VP-CEX.

All four chapters, graded against every aircraft of its type.

Built from all 207 tracked flights by VP-CEX since April 2023, the report grades the three chapters this page leaves out: corrosion, engines and brakes, utilization.

TailCheck report

VP-CEX, Dassault Falcon 7X

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Falcon 7Xs? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

Falcon 7Xs flown closest to VP-CEX’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every Falcon 7X we track, tail by tail →

07

Questions about VP-CEX.

Cite this data

Aircraft Ledger. “VP-CEX: how this Dassault Falcon 7X is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vp-cex

How many hours does VP-CEX fly a year?

About 149 estimated hours in the 12 months to 31 Oct 2026, across 42 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VP-CEX flown?

VP-CEX made 42 tracked flights in the 12 months to 31 Oct 2026, about 4 a month, and flew on about 3 days in each month it flew.

Does VP-CEX fly internationally?

9 of its 42 tracked flights in the 12 months to 31 Oct 2026, 82%, crossed a border.

When did VP-CEX last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VP-CEX uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VP-CEX?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Falcon 7Xs, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.