0102030051015Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G650VP-CJH476th busiest of 535

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G650, United Kingdom register

VP-CJH: how this Gulfstream G650 is flown

A lightly flown G650: flown less than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 60 tracked flights in the 12 months to 31 Oct 2026, on about 4 days a month and an estimated 197 hours in the air.

Every dot is one tracked G650VP-CJHMiddle G650

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G650.

VP-CJH against 536 tracked G650s over the last two years (Nov 2024 – Nov 2026): 3 flights a month (11th percentile, 476th highest of 535), where the middle G650 is at 6 and the middle half runs 4 to 9; 3 days flown a month (12th percentile, 471st highest of 535), where the middle G650 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureVP-CJHPercentileRank from the highestMiddle G650Middle half
Flights a month2.911th476th of 5356.43.9 to 9.4
Days flown a month2.512th471st of 5354.83.2 to 7.0

01

How VP-CJH compares.

Flown less often than 89% of G650s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

60

every tracked flight in the twelve months, about 5 a month

Busiest G650s

476th

of 535 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈197

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G650

02

Month by month.

VP-CJH flew more than the middle half of the fleet in 2 of 12 months. Its busiest month was December 2025, with 10 flights.

Tracked flights

Its busiest month was December 2025, with 10 flights. It did not fly in March 2026. The record has 27 tracking gaps, so about one flight in 2 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by VP-CJH, November 2025 to October 2026: busiest December 2025 (10), quietest March 2026 (0); 60 in all, against about 6 a month for the middle G650.

The data behind this chart
MonthTracked flights
November 20256
December 202510
January 20264
February 20264
March 20260
April 20260
May 20263
June 20261
July 20266
August 20267
September 20269
October 202610
Source: Aircraft Ledger, flight data for VP-CJH, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 535 tracked G650s. Every dot is one aircraft; the gold one is VP-CJH.

Chapter 4

Utilization

Gentler than its type

How hard has it been used?

Light use spends maintenance intervals slowly, but long spells parked bring their own wear: seals, corrosion and preservation. Worth asking how it was stored.

  • Flights a monthLead measure. 11th percentile

    2.9middle G650 6.4

    VP-CJH: 3 flights a month over the last two years (Nov 2024 – Nov 2026), the 11th percentile, 476th highest of 535; the middle G650 6.

    The data behind this chart
    FigureValue
    VP-CJH2.9
    Percentile11th
    Rank from the highest476th of 535
    Middle G6506.4
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month12th percentile

    2.5 dmiddle G650 4.8 d

    VP-CJH: 3 days flown a month over the last two years (Nov 2024 – Nov 2026), the 12th percentile, 471st highest of 535; the middle G650 5.

    The data behind this chart
    FigureValue
    VP-CJH2.5
    Percentile12th
    Rank from the highest471st of 535
    Middle G6504.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year29th percentile

    ≈152 hrmiddle G650 ≈205 hr

    VP-CJH: 152 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 29th percentile, 380th highest of 535; the middle G650 205.

    The data behind this chart
    FigureValue
    VP-CJH152
    Percentile29th
    Rank from the highest380th of 535
    Middle G650205
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G650s; typical is the middle half. Percentiles compare this aircraft with every tracked G650, over its record since 19 Nov 2024. The grades count only flights between two known airports, 43 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G650 fleet page.

04

What only the report shows.

The fleet is shown, and whether VP-CJH sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G650: 2.6 : 1

Also graded: short hops. Leg length is shown as context.

VP-CJH sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G650: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

VP-CJH sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G650: 26%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

VP-CJH sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on VP-CJH.

All four chapters, graded against every aircraft of its type.

Built from all 204 tracked flights by VP-CJH since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

VP-CJH, Gulfstream G650

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G650s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G650s flown closest to VP-CJH’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G650 we track, tail by tail →

07

Questions about VP-CJH.

Cite this data

Aircraft Ledger. “VP-CJH: how this Gulfstream G650 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vp-cjh

How many hours does VP-CJH fly a year?

About 197 estimated hours in the 12 months to 31 Oct 2026, across 60 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VP-CJH flown?

VP-CJH made 60 tracked flights in the 12 months to 31 Oct 2026, about 5 a month, and flew on about 4 days in each month it flew.

Does VP-CJH fly internationally?

21 of its 60 tracked flights in the 12 months to 31 Oct 2026, 84%, crossed a border.

When did VP-CJH last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VP-CJH uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VP-CJH?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G650s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.