0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500VT-CDC359th busiest of 598

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, India register

VT-CDC: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 116 tracked flights in the 12 months to 31 Oct 2026, on about 8 days a month and an estimated 358 hours in the air.

Every dot is one tracked Global 6000/6500VT-CDCMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

VT-CDC against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 5 flights a month (40th percentile, 359th highest of 598), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 4 days flown a month (41st percentile, 353rd highest of 598), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureVT-CDCPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month5.240th359th of 5986.23.8 to 10.3
Days flown a month4.241st353rd of 5984.83.0 to 7.2

01

How VT-CDC compares.

Flown less often than 60% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

116

every tracked flight in the twelve months, about 10 a month

Busiest Global 6000/6500s

359th

of 598 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈358

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

VT-CDC flew more than the middle half of the fleet in 5 of 12 months. Its busiest month was April 2026, with 16 flights.

Tracked flights

Its busiest month was April 2026, with 16 flights. It did not fly in October 2026. The record has 42 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by VT-CDC, November 2025 to October 2026: busiest April 2026 (16), quietest October 2026 (0); 116 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20255
December 202512
January 20269
February 202614
March 20269
April 202616
May 202615
June 20267
July 202610
August 202611
September 20268
October 20260
Source: Aircraft Ledger, flight data for VT-CDC, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 598 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is VT-CDC.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 40th percentile

    5.2middle Global 6000/6500 6.2

    VT-CDC: 5 flights a month over the last two years (Nov 2024 – Nov 2026), the 40th percentile, 359th highest of 598; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    VT-CDC5.2
    Percentile40th
    Rank from the highest359th of 598
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month41st percentile

    4.2 dmiddle Global 6000/6500 4.8 d

    VT-CDC: 4 days flown a month over the last two years (Nov 2024 – Nov 2026), the 41st percentile, 353rd highest of 598; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    VT-CDC4.2
    Percentile41st
    Rank from the highest353rd of 598
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year54th percentile

    ≈209 hrmiddle Global 6000/6500 ≈196 hr

    VT-CDC: 209 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 54th percentile, 276th highest of 598; the middle Global 6000/6500 196.

    The data behind this chart
    FigureValue
    VT-CDC209
    Percentile54th
    Rank from the highest276th of 598
    Middle Global 6000/6500196
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 19 Nov 2024. The grades count only flights between two known airports, 88 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether VT-CDC sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.6 : 1

Also graded: short hops. Leg length is shown as context.

VT-CDC sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

VT-CDC sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on VT-CDC.

All four chapters, graded against every aircraft of its type.

Built from all 169 tracked flights by VT-CDC since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

VT-CDC, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about VT-CDC.

Cite this data

Aircraft Ledger. “VT-CDC: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vt-cdc

How many hours does VT-CDC fly a year?

About 358 estimated hours in the 12 months to 31 Oct 2026, across 116 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VT-CDC flown?

VT-CDC made 116 tracked flights in the 12 months to 31 Oct 2026, about 10 a month, and flew on about 8 days in each month it flew.

Does VT-CDC fly internationally?

38 of its 116 tracked flights in the 12 months to 31 Oct 2026, 64%, crossed a border.

When did VT-CDC last fly?

It was last tracked in September 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VT-CDC uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VT-CDC?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.