0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 7500VT-MIR202nd busiest of 219

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 7500, India register

VT-MIR: how this Bombardier Global 7500 is flown

A lightly flown Global 7500: flown less than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 115 tracked flights in the 12 months to 31 Oct 2026, on about 7 days a month and an estimated 232 hours in the air.

Every dot is one tracked Global 7500VT-MIRMiddle Global 7500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 7500.

VT-MIR against 219 tracked Global 7500s over the last two years (Nov 2024 – Nov 2026): 3 flights a month (8th percentile, 202nd highest of 219), where the middle Global 7500 is at 7 and the middle half runs 5 to 12; 2 days flown a month (8th percentile, 202nd highest of 219), where the middle Global 7500 is at 5 and the middle half runs 4 to 9.

The data behind this chart
MeasureVT-MIRPercentileRank from the highestMiddle Global 7500Middle half
Flights a month3.08th202nd of 2197.44.5 to 11.9
Days flown a month2.58th202nd of 2195.53.6 to 8.7

01

How VT-MIR compares.

Flown less often than 92% of Global 7500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

115

every tracked flight in the twelve months, about 10 a month

Busiest Global 7500s

202nd

of 219 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈232

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 7500

02

Month by month.

VT-MIR flew more than the middle half of the fleet in 4 of 12 months. Its busiest month was April 2026, with 17 flights.

Tracked flights

Its busiest month was April 2026, with 17 flights. It did not fly in November 2025. The record has 58 tracking gaps, so about one flight in 2 may be missing and every count is a minimum.

November so far, to 14 November

Tracked flights by VT-MIR, November 2025 to October 2026: busiest April 2026 (17), quietest November 2025 (0); 115 in all, against about 7 a month for the middle Global 7500.

The data behind this chart
MonthTracked flights
November 20250
December 202514
January 202613
February 20269
March 20263
April 202617
May 20265
June 20269
July 202611
August 20268
September 202617
October 20269
Source: Aircraft Ledger, flight data for VT-MIR, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 219 tracked Global 7500s. Every dot is one aircraft; the gold one is VT-MIR.

Chapter 4

Utilization

Gentler than its type

How hard has it been used?

Light use spends maintenance intervals slowly, but long spells parked bring their own wear: seals, corrosion and preservation. Worth asking how it was stored.

  • Flights a monthLead measure. 8th percentile

    3.0middle Global 7500 7.4

    VT-MIR: 3 flights a month over the last two years (Nov 2024 – Nov 2026), the 8th percentile, 202nd highest of 219; the middle Global 7500 7.

    The data behind this chart
    FigureValue
    VT-MIR3
    Percentile8th
    Rank from the highest202nd of 219
    Middle Global 75007.4
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month8th percentile

    2.5 dmiddle Global 7500 5.5 d

    VT-MIR: 2 days flown a month over the last two years (Nov 2024 – Nov 2026), the 8th percentile, 202nd highest of 219; the middle Global 7500 5.

    The data behind this chart
    FigureValue
    VT-MIR2.5
    Percentile8th
    Rank from the highest202nd of 219
    Middle Global 75005.5
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year6th percentile

    ≈83 hrmiddle Global 7500 ≈250 hr

    VT-MIR: 83 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 6th percentile, 206th highest of 219; the middle Global 7500 250.

    The data behind this chart
    FigureValue
    VT-MIR83
    Percentile6th
    Rank from the highest206th of 219
    Middle Global 7500250
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 7500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 7500, over its record since 20 Nov 2024. The grades count only flights between two known airports, 33 since 20 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 7500 fleet page.

04

What only the report shows.

The fleet is shown, and whether VT-MIR sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 7500: 2.9 : 1

Also graded: short hops. Leg length is shown as context.

VT-MIR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 7500: 8%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

VT-MIR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle Global 7500: 21%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

VT-MIR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on VT-MIR.

All four chapters, graded against every aircraft of its type.

Built from all 115 tracked flights by VT-MIR since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

VT-MIR, Bombardier Global 7500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 7500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about VT-MIR.

Cite this data

Aircraft Ledger. “VT-MIR: how this Bombardier Global 7500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vt-mir

How many hours does VT-MIR fly a year?

About 232 estimated hours in the 12 months to 31 Oct 2026, across 115 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VT-MIR flown?

VT-MIR made 115 tracked flights in the 12 months to 31 Oct 2026, about 10 a month, and flew on about 7 days in each month it flew.

Does VT-MIR fly internationally?

17 of its 115 tracked flights in the 12 months to 31 Oct 2026, 52%, crossed a border.

When did VT-MIR last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VT-MIR uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VT-MIR?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 7500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.