010203040+05101520Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Challenger 600VT-MRF756th busiest of 822

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Challenger 600, India register

VT-MRF: how this Bombardier Challenger 600 is flown

A lightly flown Challenger 600: flown less than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 96 tracked flights in the 12 months to 31 Oct 2026, on about 7 days a month and an estimated 119 hours in the air.

Every dot is one tracked Challenger 600VT-MRFMiddle Challenger 600

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Challenger 600.

VT-MRF against 824 tracked Challenger 600s over the last two years (Nov 2024 – Nov 2026): 3 flights a month (8th percentile, 756th highest of 822), where the middle Challenger 600 is at 7 and the middle half runs 5 to 13; 2 days flown a month (4th percentile, 789th highest of 822), where the middle Challenger 600 is at 5 and the middle half runs 3 to 8.

The data behind this chart
MeasureVT-MRFPercentileRank from the highestMiddle Challenger 600Middle half
Flights a month2.88th756th of 8227.44.6 to 12.6
Days flown a month2.04th789th of 8225.33.4 to 8.0

01

How VT-MRF compares.

Flown less often than 92% of Challenger 600s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

96

every tracked flight in the twelve months, about 8 a month

Busiest Challenger 600s

756th

of 822 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈119

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Challenger 600

02

Month by month.

VT-MRF flew more than the middle half of the fleet in 3 of 12 months. Its busiest month was November 2025, with 17 flights.

Tracked flights

Its busiest month was November 2025, with 17 flights. It did not fly in April 2026. The record has 54 tracking gaps, so about one flight in 2 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by VT-MRF, November 2025 to October 2026: busiest November 2025 (17), quietest April 2026 (0); 96 in all, against about 7 a month for the middle Challenger 600.

The data behind this chart
MonthTracked flights
November 202517
December 202515
January 20268
February 202611
March 202610
April 20260
May 20260
June 20260
July 20263
August 20268
September 20269
October 202615
Source: Aircraft Ledger, flight data for VT-MRF, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 822 tracked Challenger 600s. Every dot is one aircraft; the gold one is VT-MRF.

Chapter 4

Utilization

Gentler than its type

How hard has it been used?

Light use spends maintenance intervals slowly, but long spells parked bring their own wear: seals, corrosion and preservation. Worth asking how it was stored.

  • Flights a monthLead measure. 8th percentile

    2.8middle Challenger 600 7.4

    VT-MRF: 3 flights a month over the last two years (Nov 2024 – Nov 2026), the 8th percentile, 756th highest of 822; the middle Challenger 600 7.

    The data behind this chart
    FigureValue
    VT-MRF2.8
    Percentile8th
    Rank from the highest756th of 822
    Middle Challenger 6007.4
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month4th percentile

    2.0 dmiddle Challenger 600 5.3 d

    VT-MRF: 2 days flown a month over the last two years (Nov 2024 – Nov 2026), the 4th percentile, 789th highest of 822; the middle Challenger 600 5.

    The data behind this chart
    FigureValue
    VT-MRF2
    Percentile4th
    Rank from the highest789th of 822
    Middle Challenger 6005.3
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year3rd percentile

    ≈40 hrmiddle Challenger 600 ≈167 hr

    VT-MRF: 40 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 3rd percentile, 797th highest of 822; the middle Challenger 600 167.

    The data behind this chart
    FigureValue
    VT-MRF40
    Percentile3rd
    Rank from the highest797th of 822
    Middle Challenger 600167
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Challenger 600s; typical is the middle half. Percentiles compare this aircraft with every tracked Challenger 600, over its record since 19 Nov 2024. The grades count only flights between two known airports, 37 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Challenger 600 fleet page.

04

What only the report shows.

The fleet is shown, and whether VT-MRF sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Challenger 600: 1.8 : 1

Also graded: short hops. Leg length is shown as context.

VT-MRF sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Challenger 600: 4%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

Not graded: not enough data.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle Challenger 600: 27%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

VT-MRF sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on VT-MRF.

All four chapters, graded against every aircraft of its type.

Built from all 317 tracked flights by VT-MRF since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

VT-MRF, Bombardier Challenger 600

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Challenger 600s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about VT-MRF.

Cite this data

Aircraft Ledger. “VT-MRF: how this Bombardier Challenger 600 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vt-mrf

How many hours does VT-MRF fly a year?

About 119 estimated hours in the 12 months to 31 Oct 2026, across 96 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VT-MRF flown?

VT-MRF made 96 tracked flights in the 12 months to 31 Oct 2026, about 8 a month, and flew on about 7 days in each month it flew.

Does VT-MRF fly internationally?

14 of its 96 tracked flights in the 12 months to 31 Oct 2026, 67%, crossed a border.

When did VT-MRF last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VT-MRF uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VT-MRF?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Challenger 600s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.