0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle G200YR-DSR25th busiest of 186

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Gulfstream G200, Romania register

YR-DSR: how this Gulfstream G200 is flown

A busy G200: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 234 tracked flights in the 12 months to 31 Oct 2026, on about 15 days a month and an estimated 338 hours in the air.

Every dot is one tracked G200YR-DSRMiddle G200

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked G200.

YR-DSR against 187 tracked G200s over the last two years (Nov 2024 – Nov 2026): 14 flights a month (87th percentile, 25th highest of 186), where the middle G200 is at 7 and the middle half runs 4 to 11; 9 days flown a month (88th percentile, 23rd highest of 186), where the middle G200 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureYR-DSRPercentileRank from the highestMiddle G200Middle half
Flights a month14.387th25th of 1866.84.3 to 11.0
Days flown a month9.088th23rd of 1864.93.3 to 7.4

01

How YR-DSR compares.

Busier than 87% of G200s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

234

every tracked flight in the twelve months, about 20 a month

Busiest G200s

25th

of 186 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈338

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked G200

02

Month by month.

YR-DSR flew more than the middle half of the fleet in 7 of 12 months. Its busiest month was July 2026, with 43 flights.

Tracked flights

Its busiest month was July 2026, with 43 flights. It did not fly in November 2025. The record has 50 tracking gaps, so about one flight in 5 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by YR-DSR, November 2025 to October 2026: busiest July 2026 (43), quietest November 2025 (0); 234 in all, against about 7 a month for the middle G200.

The data behind this chart
MonthTracked flights
November 20250
December 20250
January 20260
February 20260
March 202611
April 202624
May 202617
June 202640
July 202643
August 202632
September 202637
October 202630
Source: Aircraft Ledger, flight data for YR-DSR, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 186 tracked G200s. Every dot is one aircraft; the gold one is YR-DSR.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. 87th percentile

    14.3middle G200 6.8

    YR-DSR: 14 flights a month over the last two years (Nov 2024 – Nov 2026), the 87th percentile, 25th highest of 186; the middle G200 7.

    The data behind this chart
    FigureValue
    YR-DSR14.3
    Percentile87th
    Rank from the highest25th of 186
    Middle G2006.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month88th percentile

    8.9 dmiddle G200 4.9 d

    YR-DSR: 9 days flown a month over the last two years (Nov 2024 – Nov 2026), the 88th percentile, 23rd highest of 186; the middle G200 5.

    The data behind this chart
    FigureValue
    YR-DSR9
    Percentile88th
    Rank from the highest23rd of 186
    Middle G2004.9
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year83rd percentile

    ≈256 hrmiddle G200 ≈137 hr

    YR-DSR: 256 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 83rd percentile, 32nd highest of 186; the middle G200 137.

    The data behind this chart
    FigureValue
    YR-DSR256
    Percentile83rd
    Rank from the highest32nd of 186
    Middle G200137
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of G200s; typical is the middle half. Percentiles compare this aircraft with every tracked G200, over its record since 19 Nov 2024. The grades count only flights between two known airports, 286 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Gulfstream G200 fleet page.

04

What only the report shows.

The fleet is shown, and whether YR-DSR sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle G200: 1.6 : 1

Also graded: short hops. Leg length is shown as context.

YR-DSR sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle G200: 2%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

YR-DSR sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Short runways, middle G200: 53%

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

YR-DSR sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

05

The full report on YR-DSR.

All four chapters, graded against every aircraft of its type.

Built from all 600 tracked flights by YR-DSR since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

YR-DSR, Gulfstream G200

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other G200s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

06

Similar aircraft.

G200s flown closest to YR-DSR’s rate of flights a month over the last two years (Nov 2024 – Nov 2026). Each has its own free page.

Every G200 we track, tail by tail →

07

Questions about YR-DSR.

Cite this data

Aircraft Ledger. “YR-DSR: how this Gulfstream G200 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/yr-dsr

How many hours does YR-DSR fly a year?

About 338 estimated hours in the 12 months to 31 Oct 2026, across 234 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is YR-DSR flown?

YR-DSR made 234 tracked flights in the 12 months to 31 Oct 2026, about 20 a month, and flew on about 15 days in each month it flew.

Does YR-DSR fly internationally?

129 of its 234 tracked flights in the 12 months to 31 Oct 2026, 84%, crossed a border.

When did YR-DSR last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports YR-DSR uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for YR-DSR?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked G200s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.