0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500ZS-KDR4th busiest of 597

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, South Africa register

ZS-KDR: how this Bombardier Global 6000/6500 is flown

A busy Global 6000/6500: flown more than three quarters of its type over the last two years (Nov 2024 – Nov 2026). 164 tracked flights in the 12 months to 31 Oct 2026, on about 14 days a month and an estimated 143 hours in the air.

Every dot is one tracked Global 6000/6500ZS-KDRMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

ZS-KDR against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 38 flights a month (>99th percentile, 4th highest of 597), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 13 days flown a month (97th percentile, 19th highest of 597), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureZS-KDRPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month38.1>99th4th of 5976.23.8 to 10.3
Days flown a month12.997th19th of 5974.83.0 to 7.2

01

How ZS-KDR compares.

Busier than 100% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

164

every tracked flight in the twelve months, about 14 a month

Busiest Global 6000/6500s

4th

of 597 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈143

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

ZS-KDR flew more than the middle half of the fleet in 3 of 12 months. Its busiest month was October 2026, with 70 flights.

Tracked flights

Its busiest month was October 2026, with 70 flights. It did not fly in November 2025. The record has 32 tracking gaps, so about one flight in 5 may be missing and every count is a minimum.

November so far, to 12 November

Tracked flights by ZS-KDR, November 2025 to October 2026: busiest October 2026 (70), quietest November 2025 (0); 164 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20250
December 20250
January 20260
February 20260
March 20260
April 20260
May 202665
June 202629
July 20260
August 20260
September 20260
October 202670
Source: Aircraft Ledger, flight data for ZS-KDR, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 597 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is ZS-KDR.

Chapter 4

Utilization

Harsher than its type

How hard has it been used?

Heavy use means more of its maintenance intervals have been used up. Worth checking where it sits in its inspection cycle before a pre-buy.

  • Flights a monthLead measure. >99th percentile

    38.1middle Global 6000/6500 6.2

    ZS-KDR: 38 flights a month over the last two years (Nov 2024 – Nov 2026), the >99th percentile, 4th highest of 597; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    ZS-KDR38.1
    Percentile>99th
    Rank from the highest4th of 597
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month97th percentile

    12.9 dmiddle Global 6000/6500 4.8 d

    ZS-KDR: 13 days flown a month over the last two years (Nov 2024 – Nov 2026), the 97th percentile, 19th highest of 597; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    ZS-KDR12.9
    Percentile97th
    Rank from the highest19th of 597
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year85th percentile

    ≈476 hrmiddle Global 6000/6500 ≈194 hr

    ZS-KDR: 476 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 85th percentile, 90th highest of 597; the middle Global 6000/6500 194.

    The data behind this chart
    FigureValue
    ZS-KDR476
    Percentile85th
    Rank from the highest90th of 597
    Middle Global 6000/6500194
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 18 Nov 2024. The grades count only flights between two known airports, 267 since 18 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether ZS-KDR sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.7 : 1

Also graded: short hops. Leg length is shown as context.

ZS-KDR sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

Not graded: not enough data.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on ZS-KDR.

All four chapters, graded against every aircraft of its type.

Built from all 817 tracked flights by ZS-KDR since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

ZS-KDR, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about ZS-KDR.

Cite this data

Aircraft Ledger. “ZS-KDR: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/zs-kdr

How many hours does ZS-KDR fly a year?

About 143 estimated hours in the 12 months to 31 Oct 2026, across 164 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is ZS-KDR flown?

ZS-KDR made 164 tracked flights in the 12 months to 31 Oct 2026, about 14 a month, and flew on about 14 days in each month it flew.

Does ZS-KDR fly internationally?

8 of its 164 tracked flights in the 12 months to 31 Oct 2026, 8%, crossed a border.

When did ZS-KDR last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports ZS-KDR uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for ZS-KDR?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.