0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500N667JD294th busiest of 598

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, United States register

N667JD: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 102 tracked flights in the 12 months to 31 Oct 2026, on about 6 days a month and an estimated 245 hours in the air.

Every dot is one tracked Global 6000/6500N667JDMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

N667JD against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 6 flights a month (51st percentile, 294th highest of 598), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 5 days flown a month (52nd percentile, 288th highest of 598), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureN667JDPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month6.451st294th of 5986.23.8 to 10.3
Days flown a month5.052nd288th of 5984.83.0 to 7.2

01

How N667JD compares.

Busier than 51% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

102

every tracked flight in the twelve months, about 9 a month

Busiest Global 6000/6500s

294th

of 598 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈245

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

N667JD flew more than the middle half of the fleet in 3 of 12 months. Its busiest month was July 2026, with 17 flights.

Tracked flights

Its busiest month was July 2026, with 17 flights, and its quietest December 2025, with 2. The record has 32 tracking gaps, so about one flight in 3 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by N667JD, November 2025 to October 2026: busiest July 2026 (17), quietest December 2025 (2); 102 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 20257
December 20252
January 20262
February 20267
March 20265
April 202610
May 20268
June 202613
July 202617
August 202610
September 202612
October 20269
Source: Aircraft Ledger, flight data for N667JD, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 598 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is N667JD.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 51st percentile

    6.4middle Global 6000/6500 6.2

    N667JD: 6 flights a month over the last two years (Nov 2024 – Nov 2026), the 51st percentile, 294th highest of 598; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    N667JD6.4
    Percentile51st
    Rank from the highest294th of 598
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month52nd percentile

    5.0 dmiddle Global 6000/6500 4.8 d

    N667JD: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 52nd percentile, 288th highest of 598; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    N667JD5
    Percentile52nd
    Rank from the highest288th of 598
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year41st percentile

    ≈170 hrmiddle Global 6000/6500 ≈196 hr

    N667JD: 170 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 41st percentile, 353rd highest of 598; the middle Global 6000/6500 196.

    The data behind this chart
    FigureValue
    N667JD170
    Percentile41st
    Rank from the highest353rd of 598
    Middle Global 6000/6500196
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 19 Nov 2024. The grades count only flights between two known airports, 148 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether N667JD sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.6 : 1

Also graded: short hops. Leg length is shown as context.

N667JD sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

N667JD sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on N667JD.

All four chapters, graded against every aircraft of its type.

Built from all 442 tracked flights by N667JD since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

N667JD, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about N667JD.

Cite this data

Aircraft Ledger. “N667JD: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/n667jd

How many hours does N667JD fly a year?

About 245 estimated hours in the 12 months to 31 Oct 2026, across 102 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is N667JD flown?

N667JD made 102 tracked flights in the 12 months to 31 Oct 2026, about 9 a month, and flew on about 6 days in each month it flew.

Does N667JD fly internationally?

6 of its 102 tracked flights in the 12 months to 31 Oct 2026, 9%, crossed a border.

When did N667JD last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports N667JD uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for N667JD?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.