0102030+051015+Flights a monthDays flown a monthBusy, flown most daysBusy, on fewer daysMiddle Global 6000/6500VH-FGJ294th busiest of 598

Updated · Flights through , named aircraft run a week behind · Updated daily

Tail record, Bombardier Global 6000/6500, Australia register

VH-FGJ: how this Bombardier Global 6000/6500 is flown

Flown about as much as most Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): inside the middle half of its type. 90 tracked flights in the 12 months to 31 Oct 2026, on about 6 days a month and an estimated 183 hours in the air.

Every dot is one tracked Global 6000/6500VH-FGJMiddle Global 6000/6500

Flight counts and hours are for the twelve months to 31 Oct 2026; named aircraft are shown a week behind. Grades compare its record over the last two years (Nov 2024 – Nov 2026) with every tracked Global 6000/6500.

VH-FGJ against 598 tracked Global 6000/6500s over the last two years (Nov 2024 – Nov 2026): 6 flights a month (51st percentile, 294th highest of 598), where the middle Global 6000/6500 is at 6 and the middle half runs 4 to 10; 5 days flown a month (59th percentile, 246th highest of 598), where the middle Global 6000/6500 is at 5 and the middle half runs 3 to 7.

The data behind this chart
MeasureVH-FGJPercentileRank from the highestMiddle Global 6000/6500Middle half
Flights a month6.451st294th of 5986.23.8 to 10.3
Days flown a month5.559th246th of 5984.83.0 to 7.2

01

How VH-FGJ compares.

Busier than 51% of Global 6000/6500s, by flights a month over the last two years (Nov 2024 – Nov 2026).

Tracked flights

90

every tracked flight in the twelve months, about 8 a month

Busiest Global 6000/6500s

294th

of 598 tracked, by flights a month over the last two years (Nov 2024 – Nov 2026)

Estimated hours

≈183

every tracked flight in the twelve months, from time in the air

Flights a month, every tracked Global 6000/6500

02

Month by month.

VH-FGJ flew more than the middle half of the fleet in 1 of 12 months. Its busiest month was November 2025, with 11 flights.

Tracked flights

Its busiest month was November 2025, with 11 flights, and its quietest March 2026, with 4. The record has 16 tracking gaps, so about one flight in 6 may be missing and every count is a minimum.

November so far, to 13 November

Tracked flights by VH-FGJ, November 2025 to October 2026: busiest November 2025 (11), quietest March 2026 (4); 90 in all, against about 6 a month for the middle Global 6000/6500.

The data behind this chart
MonthTracked flights
November 202511
December 20257
January 20265
February 20266
March 20264
April 202610
May 202610
June 20266
July 20267
August 20269
September 20267
October 20268
Source: Aircraft Ledger, flight data for VH-FGJ, the twelve months to 31 Oct 2026. Flight counts only: airports and exact dates are left out of this page.

03

The free chapter.

Each measure over the last two years (Nov 2024 – Nov 2026), against all 598 tracked Global 6000/6500s. Every dot is one aircraft; the gold one is VH-FGJ.

Chapter 4

Utilization

Typical for its type

How hard has it been used?

Used at about the rate of most of the fleet, so its maintenance intervals have been used up at a normal pace.

  • Flights a monthLead measure. 51st percentile

    6.4middle Global 6000/6500 6.2

    VH-FGJ: 6 flights a month over the last two years (Nov 2024 – Nov 2026), the 51st percentile, 294th highest of 598; the middle Global 6000/6500 6.

    The data behind this chart
    FigureValue
    VH-FGJ6.4
    Percentile51st
    Rank from the highest294th of 598
    Middle Global 6000/65006.2
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Days flown a month59th percentile

    5.5 dmiddle Global 6000/6500 4.8 d

    VH-FGJ: 5 days flown a month over the last two years (Nov 2024 – Nov 2026), the 59th percentile, 246th highest of 598; the middle Global 6000/6500 5.

    The data behind this chart
    FigureValue
    VH-FGJ5.5
    Percentile59th
    Rank from the highest246th of 598
    Middle Global 6000/65004.8
    Windowthe last two years (Nov 2024 – Nov 2026)
  • Estimated hours a year34th percentile

    ≈148 hrmiddle Global 6000/6500 ≈196 hr

    VH-FGJ: 148 estimated hours a year over the last two years (Nov 2024 – Nov 2026), the 34th percentile, 395th highest of 598; the middle Global 6000/6500 196.

    The data behind this chart
    FigureValue
    VH-FGJ148
    Percentile34th
    Rank from the highest395th of 598
    Middle Global 6000/6500196
    Windowthe last two years (Nov 2024 – Nov 2026)

Harsher means harder on the aircraft than three quarters of Global 6000/6500s; typical is the middle half. Percentiles compare this aircraft with every tracked Global 6000/6500, over its record since 19 Nov 2024. The grades count only flights between two known airports, 160 since 19 Nov 2024, and “a month” is a month it flew; the figures at the top count every tracked flight in the twelve months to 31 Oct 2026. Every measure’s full spread across the fleet is on the Bombardier Global 6000/6500 fleet page.

04

What only the report shows.

The fleet is shown, and whether VH-FGJ sits inside its middle half. Its grades and values are in the full report.

Chapter 1

Fatigue

Hours per landing, middle Global 6000/6500: 2.6 : 1

Also graded: short hops. Leg length is shown as context.

VH-FGJ sits outside the middle half, on one side or the other. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 2

Corrosion

Salt air, middle Global 6000/6500: 6%

Also graded: damp air, freeze–thaw, near the coast and moisture in the air.

VH-FGJ sits inside the middle half. Its grade and exact place are in the full report.

Unlock this chapter

Chapter 3

Engines and brakes

Also graded: hot, high takeoffs; density altitude; dust and dry climate.

Not graded: not enough data.

Unlock this chapter

05

The full report on VH-FGJ.

All four chapters, graded against every aircraft of its type.

Built from all 285 tracked flights by VH-FGJ since April 2023, the report grades the three chapters this page leaves out: fatigue, corrosion, engines and brakes.

TailCheck report

VH-FGJ, Bombardier Global 6000/6500

$395one aircraft

  • All four chapters, graded
  • Its weekly and seasonal rhythm
  • PDF, CSV and a share link; open for three months, kept up to date
Unlock the full report

See a sample report first

Weighing it against other Global 6000/6500s? Put it on a Spotlight board with up to four others. Included with Unlimited, $995 a month.

07

Questions about VH-FGJ.

Cite this data

Aircraft Ledger. “VH-FGJ: how this Bombardier Global 6000/6500 is flown.” Data through 31 Oct 2026. aircraftledger.com/aircraft/vh-fgj

How many hours does VH-FGJ fly a year?

About 183 estimated hours in the 12 months to 31 Oct 2026, across 90 tracked flights. Hours are estimated from time in the air, so the logbook has the exact figure.

How often is VH-FGJ flown?

VH-FGJ made 90 tracked flights in the 12 months to 31 Oct 2026, about 8 a month, and flew on about 6 days in each month it flew.

Does VH-FGJ fly internationally?

7 of its 90 tracked flights in the 12 months to 31 Oct 2026, 10%, crossed a border.

When did VH-FGJ last fly?

It was last tracked in October 2026. We publish an aircraft’s flights seven days after they happen, and show them by month only.

Why don’t you show which airports VH-FGJ uses?

We leave out airports, bases and exact dates on purpose. We show how an aircraft has been used, not where it goes.

What’s in the full TailCheck report for VH-FGJ?

All four graded chapters (Fatigue, Corrosion, Engines and brakes, and Utilization), each against the tracked Global 6000/6500s, plus the operational summary and operating rhythm, as a PDF, CSV and share link. It costs $395, or $995 a month for unlimited reports and Spotlight.

Method: flight data, every count a minimum. Estimated hours from time in the air. About our data

Owners and operators can ask us not to publish an aircraft. Data policy and opt-out

Not a substitute for a pre-purchase inspection or records review. TailCheck shows how an aircraft has been used, not its condition.